Tender Details
About Tender
🌉 Procurement Opportunity: Steel Girder Bridge Construction 🛠️🌉 The Public Works Department Of The State Government And Union Territories Invites Bids For The Engineering, Procurement, And Construction (Epc) Of A 20 Meter Span Single Lane Steel Girder Bridge Over Tangtse Nallah At Klabuk Mohallah Yerath, Leh. 📅 Bid Submission Deadline: July 22, 2024, 4:00 Pm Tender Fee: Inr 3000 Earnest Money Deposit (Emd): Inr 400000 Interested Bidders Must Possess The Requisite Expertise In Bridge Construction And Adhere To The Project's Design, Fabrication, Launching, And Commissioning Requirements. Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted. Keywords: Steel Girder Bridge, Epc Mode, Public Works Department, Capex, Leh, Construction Tender, Bridge Construction, Infrastructure ProjectParticulars | Details |
---|---|
Title |
Designing Fabrication , Launching And Commissioning Of 20 Mtr Span Single Lane Steel Girder Bridge Over Tangtse Nallah At Klabuk Mohallah Yerath On Epc Mode ( Under Capex )
|
Description |
Designing Fabrication , Launching And Commissioning Of 20 Mtr Span Single Lane Steel Girder Bridge Over Tangtse Nallah At Klabuk Mohallah Yerath On Epc Mode ( Under Capex )
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2024_PWD_13259_1 |
Reference Number |
|
Tender Fee | 3000 |
EMD | 4 Lakh |
Tender Value | |
Place | Leh |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=33348 |
Start Date | July 03, 2024 23:30 |
End Date |
22/07/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreMaintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Read moreDesign constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Design constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreConstruction of steel bridge including the supply and fabrication of steel girder, installation of bearings, over hindon canal and feeder canal for fire tender movement at new ashok nagar for delhi- ghaziabad- meerut namo bharat corridor.
Construction of steel bridge including the supply and fabrication of steel girder, installation of bearings, over hindon canal and feeder canal for fire tender movement at new ashok nagar for delhi- ghaziabad- meerut namo bharat corridor.
Read moreConst. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Const. of ec for gammon junc at km. 903.265 (blackspot id no. ap(05)-092)and diwancheruvu junc at km. 902.308(blackspot id no.ap(03)-299) on nh16 in andhra pradesh under nh(o) on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreof your Industry type