Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of P.C.C Road From Jaintgarh Parsa Pwd Road Of Mundai Panchayat To Kangira River Via Gutusai Nilkant Mandir L 1.350 Km
|
Description |
Construction Of P.C.C Road From Jaintgarh Parsa Pwd Road Of Mundai Panchayat To Kangira River Via Gutusai Nilkant Mandir L 1.350 Km
|
Organisation | RWD EinC | State Govt. and UT |
Tender Id | 2024_RWD_88467_1 |
Reference Number |
03/2024-25/RWD/EE/CHAIBASA |
Tender Fee | 10000 |
EMD | 1.99 Lakh |
Tender Value | |
Place | CHAIBASA |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=119235 |
Start Date | July 20, 2024 19:30 |
End Date |
29/07/2024 ( Expired 342 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConstruction of c.c. road from mukesh paliwal house to sanjay upadhyay house and shamim kuraishi house to ghanshyam sahu in ward no. 09, nagar parishad, tendukheda
Construction of c.c. road from mukesh paliwal house to sanjay upadhyay house and shamim kuraishi house to ghanshyam sahu in ward no. 09, nagar parishad, tendukheda
Read moreConstruction of c.c. road from koushal sahu house to sovran rajput house in ward no. 13, nagar parishad, tendukheda
Construction of c.c. road from koushal sahu house to sovran rajput house in ward no. 13, nagar parishad, tendukheda
Read moreConstruction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda
Construction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConstruction of bt road from pani tanki to main road chatrapati school and different location in kidwai ward betul
Construction of bt road from pani tanki to main road chatrapati school and different location in kidwai ward betul
Read moreof your Industry type