Tender Details

Particulars Details
Title
Construction Of P.C.C Road From Jaintgarh Parsa Pwd Road Of Mundai Panchayat To Kangira River Via Gutusai Nilkant Mandir L 1.350 Km
Description
Construction Of P.C.C Road From Jaintgarh Parsa Pwd Road Of Mundai Panchayat To Kangira River Via Gutusai Nilkant Mandir L 1.350 Km
Organisation RWD EinC | State Govt. and UT
Tender Id 2024_RWD_88467_1
Reference
Number
03/2024-25/RWD/EE/CHAIBASA
Tender Fee 10000
EMD 1.99 Lakh
Tender Value
Place CHAIBASA
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=119235
Start Date July 20, 2024 19:30
End Date

29/07/2024 ( Expired 342 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Read more
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana

Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Construction of c.c. road from mukesh paliwal house to sanjay upadhyay house and shamim kuraishi house to ghanshyam sahu in ward no. 09, nagar parishad, tendukheda

Construction of c.c. road from mukesh paliwal house to sanjay upadhyay house and shamim kuraishi house to ghanshyam sahu in ward no. 09, nagar parishad, tendukheda

Read more
Construction of c.c. road from koushal sahu house to sovran rajput house in ward no. 13, nagar parishad, tendukheda

Construction of c.c. road from koushal sahu house to sovran rajput house in ward no. 13, nagar parishad, tendukheda

Read more
Construction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda

Construction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Construction of bt road from pani tanki to main road chatrapati school and different location in kidwai ward betul

Construction of bt road from pani tanki to main road chatrapati school and different location in kidwai ward betul

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise