Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Office Shifting Works In Connection With Head Office Refurbishment And Other Miscellaneous Activity For A Period Of One Year From The Date Of Placement Of Work Order.
|
Description |
Office Shifting Works In Connection With Head Office Refurbishment And Other Miscellaneous Activity For A Period Of One Year From The Date Of Placement Of Work Order.
|
Organisation | Kolkata Port Trust | Central Govt. Ministry/Department |
Tender Id | 2025_KoPT_854579_1 |
Reference Number |
SMPK/KDS/CIV/T/2934/07 |
Tender Fee | 1770 |
EMD | 68840 |
Tender Value | |
Place | HO SMPK |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=898470 |
Start Date | March 27, 2025 19:30 |
End Date |
17/04/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Up-gradation of dinanagar gharota road km 0.00 to 10.68 km including maintenance of road for 5 years (one year defect liability period and four years maintenance period) in distt. pathankot
Up-gradation of dinanagar gharota road km 0.00 to 10.68 km including maintenance of road for 5 years (one year defect liability period and four years maintenance period) in distt. pathankot
Read moreShifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor
Shifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreE tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
Read moreElectrification work in connection with construction of training hall with hollow section truss and false ceiling above second floor level of the office building of dda admn nadia krishnagar nadia
Electrification work in connection with construction of training hall with hollow section truss and false ceiling above second floor level of the office building of dda admn nadia krishnagar nadia
Read morePettyplumbing and sanitary works inside n.s. dock including che building, libyanwarehouse for the period one year from the date of placement of work order
Pettyplumbing and sanitary works inside n.s. dock including che building, libyanwarehouse for the period one year from the date of placement of work order
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreof your Industry type