Tender Details
Particulars | Details |
---|---|
Title |
Repairing Work Of Operator Seat Assly With Mounting,Seat Mechanism And Seat Suspension, Complete Centre Joint Assly Removal , Seal Changing And Fitment And Both Swing Motor Mounting Hole Making Of Tata Hitachi Excavator 186
|
Description |
Repairing Work Of Operator Seat Assly With Mounting,Seat Mechanism And Seat Suspension, Complete Centre Joint Assly Removal , Seal Changing And Fitment And Both Swing Motor Mounting Hole Making Of Tata Hitachi Excavator 186
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_321892_1 |
Reference Number |
AKKOCP/PE (X)/E-Tender/2024-25/60 |
Tender Fee | 0 |
EMD | 3700 |
Tender Value | |
Place | AKK OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333675 |
Start Date | November 26, 2024 14:30 |
End Date |
06/12/2024 ( Expired 158 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Offloading work for repairing of oval mounting holes of base plate and rack segments with alignment of rack segments and fitment of barrel bolts and joint studs in 24 96 pawan dragline of dudhichua project
Offloading work for repairing of oval mounting holes of base plate and rack segments with alignment of rack segments and fitment of barrel bolts and joint studs in 24 96 pawan dragline of dudhichua project
Read moreRepairing / reconditioning of track chain, front idler assly, carrier roller, lower roller, sprocket and track frame both sides of tata excavator, exc-200 model of deulbera colliery.
Repairing / reconditioning of track chain, front idler assly, carrier roller, lower roller, sprocket and track frame both sides of tata excavator, exc-200 model of deulbera colliery.
Read moreRepairing of centre joint-01 no. and swing device assembly-01 no applicable to tata ex1200vd shovel sl. no. oaby000119 deployed at karma ocp, kuju area.
Repairing of centre joint-01 no. and swing device assembly-01 no applicable to tata ex1200vd shovel sl. no. oaby000119 deployed at karma ocp, kuju area.
Read moreDismantling, repairing and fitment of plummer block, yoke assly oscillation bush yoke centre and bush yoke material filling and finishing work of eyes and bush fitment work, mast supporting frame fabrication work in drill 840 of kdh project.
Dismantling, repairing and fitment of plummer block, yoke assly oscillation bush yoke centre and bush yoke material filling and finishing work of eyes and bush fitment work, mast supporting frame fabrication work in drill 840 of kdh project.
Read moreRepairing of water line system, both side rear suspension, both side tie rod, axle rod and rear suspension bush hole and replacement of 12 nos bush and removal of 20 nos stud bolt of both rear tyre of ws-28-ii 28054 of kdh project, nk area.
Repairing of water line system, both side rear suspension, both side tie rod, axle rod and rear suspension bush hole and replacement of 12 nos bush and removal of 20 nos stud bolt of both rear tyre of ws-28-ii 28054 of kdh project, nk area.
Read moreRepairing of a frame, housing, bush making and fitting, removal of broken stud, repairing of front brake rhs and front suspension support, repair of rear suspension both side and bush fitment of dumper d 1304 of kdh project, nk area.
Repairing of a frame, housing, bush making and fitting, removal of broken stud, repairing of front brake rhs and front suspension support, repair of rear suspension both side and bush fitment of dumper d 1304 of kdh project, nk area.
Read moreRep. of both side brake assembly, brake booster, replacement of brake shoe, with complete fitment and removal and fitment of cabin and sel tank and cabin mounting with welding and grinding with complete fitment work of dozer bd-355 sl. no. t-11902
Rep. of both side brake assembly, brake booster, replacement of brake shoe, with complete fitment and removal and fitment of cabin and sel tank and cabin mounting with welding and grinding with complete fitment work of dozer bd-355 sl. no. t-11902
Read moreReplacement of differential assy and rhs frony hub assy of bh35-2 dumper sl no 35225 and removal of engine from dumper 35225, repairing of oval shape of the mounting hole and bracket of engine, fitment of removed engine in dumper
Replacement of differential assy and rhs frony hub assy of bh35-2 dumper sl no 35225, and removal of engine from dumper 35225, repairing of oval shape of the mounting hole and bracket of engine, fitment of removed engine in dumper
Read moreRepairing of rhs final drive, removal of 16 no. brocken bolts of swing, ring gear, 3. removal of engine from shovel ck300 sl no. 792, repairing of oval shape of the mounting hole and bracket of engine, fitment of removed engine in shovel
Repairing of rhs final drive, removal of 16 no. brocken bolts of swing, ring gear, 3. removal of engine from shovel ck300 sl no. 792, repairing of oval shape of the mounting hole and bracket of engine, fitment of removed engine in shovel
Read moreReparing of worn out equalizer bar,along with reparing, removal ,material filling ,polishing and fitment of centre pin repairing and changing of pad of bd355 dozer sl.no 11858 working at lajkura ocp
Reparing of worn out equalizer 
 bar,along with reparing, 
 removal ,material filling 
 ,polishing and fitment of 
 centre pin repairing and 
 changing of pad of bd355 
 dozer sl.no 11858 working at 
 lajkura ocp
Read moreof your Industry type