Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Central Air Conditioning Facility In Non Ac Area Of Esb2 At Level 1 2 And 3 Iit Kanpur
|
Description |
Providing Central Air Conditioning Facility In Non Ac Area Of Esb2 At Level 1 2 And 3 Iit Kanpur
|
Organisation | Indian Institute of Technology Kanpur | Central Govt. Ministry/Department |
Tender Id | 2025_IITK_848963_1 |
Reference Number |
64/AC/EE/2025 |
Tender Fee | 0 |
EMD | 22002 |
Tender Value | |
Place | IIT Kanpur |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=896599 |
Start Date | March 11, 2025 22:30 |
End Date |
18/03/2025 ( Expired 110 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSupply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Supply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Read moreSitc of area gamma monitor, portable monitoring system, alpha-beta counting system, teletector and neutron monitor at project site in nd(v)
Sitc of area gamma monitor, portable monitoring system, alpha-beta counting system, teletector and neutron monitor at project site in nd(v)
Read moreProviding laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Read moreMaintenance of line through under ground cabling in kunjaban extension area where key installations including state disaster response control room is situated and creation of infrastructure and installation of 17 nos dt at different areas under ed ca
Maintenance of line through under ground cabling in kunjaban extension area where key installations including state disaster response control room is situated and creation of infrastructure and installation of 17 nos dt at different areas under ed ca
Read moreResurfacing of roads and road furniture in dometic area at af stn naliya
Resurfacing of roads and road furniture in dometic area at af stn naliya
Read moreSupply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Read moreof your Industry type