Tender Details
Particulars | Details |
---|---|
Title |
Repairing/ Replacement Of Fencing Structure Around Rotary Breaker Body Its Motor And Gearbox For Rotary Breaker Unit 203 A And 203 B From Safety Point Of View At Moonidih Coal Washery.
|
Description |
Repairing/ Replacement Of Fencing Structure Around Rotary Breaker Body Its Motor And Gearbox For Rotary Breaker Unit 203 A And 203 B From Safety Point Of View At Moonidih Coal Washery..
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_332949_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1831 |
Tender Fee | 0 |
EMD | 2300 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345143 |
Start Date | March 20, 2025 14:30 |
End Date |
24/03/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and commissioning of switch disconnector isolator unit to obstruct back feeding supply from other sources from safety point of view at gm unit, hingula area.
Supply and commissioning of switch disconnector isolator unit to obstruct back feeding supply from other sources from safety point of view at gm unit, hingula area.
Read moreRepairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Read moreRepairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Repairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Read moreRepairing of end shield (motor dala) of 8.5kw unbalanced motor 4 nos. 18.5 kw motor dala 4 nos., 30kw motor dala 4 nos. and 11 kw motor dala 3 nos. total 15 nos. at moonidih coal washery
Repairing of end shield (motor dala) of 8.5kw unbalanced motor 4 nos. 18.5 kw motor dala 4 nos., 30kw motor dala 4 nos. and 11 kw motor dala 3 nos. total 15 nos. at moonidih coal washery
Read moreRepairing/ strengthening of take-up structure, side stairs and bracing of unit 704 belt conveyor of moonidih coal washery.
Repairing/ strengthening of take-up structure, side stairs and bracing of unit 704 belt conveyor of moonidih coal washery.
Read moreRepairing/ changing of sieve bend holding structure and its chute of unit 603-1,2,3 and 4 at 29m floor of washery building at moonidih coal washery.
Repairing/ changing of sieve bend holding structure and its chute of unit 603-1,2,3 and 4 at 29m floor of washery building at moonidih coal washery.
Read moreRepairing / reconditioning of the motor controlling pannel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.
Repairing / reconditioning of the motor controlling panel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.
Read moreRepairing of damaged screen side frame and base frame and underdeck structure of electromag screen unit 604-1 and 604-2 at 29m floor of washery building of moonidih coal washery.
Repairing of damaged screen side frame and base frame and underdeck structure of electromag screen unit 604-1 and 604-2 at 29m floor of washery building of moonidih coal washery.
Read moreDismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Read moreInstallation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Read moreof your Industry type