Tender Details

Particulars Details
Title
Strengthening And Raising The Existing Bund In The South Side Of Primary Pond From Ch 2770m To Ch 2915m For A Length Of 145m In Ash Dyke Area
Description
Strengthening And Raising The Existing Bund In The South Side&Amp#X0d Of Primary Pond From Ch 2770m To Ch 2915m For A Length Of&Amp#X0d 145m In Ash Dyke Area
Organisation TNEB Limited | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 10600
Tender Value
Place TTPS
Link

AAAAAAAAAA

Login to view
Start Date July 03, 2025 23:30
End Date

21/07/2025 ( 3 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Invitation of bids to develop petroleum and petroleum product (atf) pipeline from devangonthi to existing common user fuel farm station and upcoming satellite fuel farm station inside kempegowda international airport

Grant of authorization for development of petroleum and petroleum product (atf) pipeline from devangonthi to existing &#x0d common user fuel farm station and upcoming satellite fuel farm station inside &#x0d kempegowda international

Read more
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26

Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26

Read more
Strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-04 br-03 br-02 and br- 01) of nh-27 from km.156.456 to km.285.007 in the state of bihar on single percentage rate contract mode (2nd call)

Strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-04 br-03 br-02 and br- 01) of nh-27 from km.156.456 to km.285.007 in the state of bihar on single percentage rate contract mode (2nd call)

Read more
Strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-09 br-08 br-07 br-06) of nh-27 from km.0.000 to 145.646 in the state of bihar on single percentage rate contract mode (2nd call)

Strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-09 br-08 br-07 br-06) of nh-27 from km.0.000 to 145.646 in the state of bihar on single percentage rate contract mode (2nd call)

Read more
Long term measures for permanent rectification black spot id-cg-(04)-01 from ch. 19.400 to 20.900 (infront of g.k. township to charoda bypass crossing) in the state of chhattisgarh

Long term measures for permanent rectification black spot id-cg-(04)-01 from ch. 19.400 to 20.900 (infront of g.k. township to charoda bypass crossing) in the state of chhattisgarh

Read more
Consultancy services for pre of dpr for rehabi, upgradation of existing road bet km 29.300 to km 55.550 jhala to sukhi bend from existing single lane to double lane with paved shoulder specification on gangotri uttarkashi dharasu road

Consultancy services for prepar of dpr for rehabilitation and upgradation of existing road bet km 29.300 to km 55.550 jhala to sukhi bend from existing single lane to double lane with paved shoulder specification on gangotri uttarkashi dharasu road

Read more
Independent engineer services

Independent engineer services &#x0d for&#x0d construction of nagaur bypass from existing km161 to 000 km to 173 to 100 and widening to four lane with paved shoulders from nagaur to netra in the state of rajasthan on ham mode&#x0d

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Performance based maint contracts esti of initial rectification wk, routine maint wk and periodic maint wks bet km 1.957 to km 65.0 design length 56.618 km km 133.020 to km 137.330 design length 4.316 km chinyal

Pbmc estimate bet km 1.957 to km 65.00, km 133.020 to km 137.330 on rishikesh dharasu road and km 110.860 to km 123.080 on gangotri dharasu road on nh 34 in uttarakhand state (total length 73.192 km) for 5 year maintenance period

Read more
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise