Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall At Swm Unit At Birkulti Under 15th Cfc Fund. Activity Code 110200477 Of 2025 26
|
Description |
Construction Of Boundary Wall At Swm Unit At Birkulti Under 15th Cfc Fund. Activity Code 110200477 Of 2025 26
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 750 |
EMD | 6000 |
Tender Value | |
Place | Hijalgora |
Link |
AAAAAAAAAA Login to view |
Start Date | June 24, 2025 18:30 |
End Date |
03/07/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreDesign, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreTr-13-2025 construction of various 132kv and 33kv works at 400kv substation ujjain (tajpur) on turnkey basis.
Tr-13-2025 construction of various 132kv and 33kv works at 400kv substation ujjain tajpur on turnkey basis.
Read moreCe chz chm t 06 2025 26 provision of roof top solar plants totalling 500 kw at certainbuildings at chandimandir
Ce chz chm t 06 2025 26 provision of roof top solar plants totalling 500 kw at certain buildings at chandimandir
Read more8466 construction of porta cabin structure at rameswaram under ge tirunelveli
Construction of porta cabin structure at rameswaram under ge tirunelveli
Read moreDemolition of existing boundary wall and provision of high security cum retaining wall at otm complex icgs gopalpur
Demolition of existing boundary wall and provision of high security cum retaining wall at otm complex icgs gopalpur
Read moreConstruction of boundary wall at stp in ward no 12
Construction of boundary wall at stp in ward no 12
Read moreof your Industry type