Tender Details

Particulars Details
Title
General Totalstation Survey And Preparation Of Alignment For Widening Kallara Vor Road Ch 0/000 3/040 And Kallara Junction
Description
General Totalstation Survey And Preparation Of Alignment For Widening Kallara Vor Road Ch 0/000 3/040 And Kallara Junction
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_650851_1
Reference
Number
PWD/RB/TR/19944/2023_5_1_1/1
Tender Fee 555
EMD 3308
Tender Value -
Place Kaduthuruthy
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1025517

Start Date February 21, 2024 19:30
End Date
Expired 29/02/2024

Expired 955 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri

Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)

Read more
1conducting detailed survey, preparation of alignment plan in compliance

1conducting detailed survey, preparation of alignment plan in compliance with irc and obtaining approval of the alignment plan from se, pwd chandrapur for the work, di of pwd road connecting gouri and chincholi villages passing through mine le

Read more
General total station survey in piravom kaduthuruthy road ch10/000 -14/200 km - total station survey in piravom- kaduthuruthy road ch- 10/000-14/200 km for the preparation of new alignment including widening and straightening of dangerous curves

General total station survey in piravom kaduthuruthy road ch10/000 -14/200 km - total station survey in piravom- kaduthuruthy road ch- 10/000-14/200 km for the preparation of new alignment including widening and straightening of dangerous curves

Read more
General-civil work- widening of kakkanad infopark road -preparation of alignment for road widening .-general civil work

Widening of this road to ease the traffic flow is&amp#x0d a long pending demand from the local public.for the preparation of dpr, it is essential to survey the entire road stretch and to develop an alignment plan. the estimated amount is rs&amp#x0d .2.597 lakhs.

Read more
Generaltotal station survey for the preparation of new alignment in vadakkumkoor bypass roadinvestigation work1

Total station survey for the preparation of new alignment in vadakkumkoor bypass roadinvestigation work1

Read more
General investigation work for the widening of kolathara kodinattumukku kunnathupalam road alignment preparation investigation work

General investigation work for the widening of kolathara kodinattumukku kunnathupalam road alignment preparation investigation work

Read more
General-kombodinjamakkal junction improvement (nava kerala sadassu complaint)-investigation survey and alignment fixing in irinjalakuda lac-

General-kombodinjamakkal junction&amp#x0d improvement (nava kerala sadassu&amp#x0d complaint)-investigation survey and alignment&amp#x0d fixing in irinjalakuda lac-general civil work

Read more
Kiifb - manjeri olipuzha road- widening and providing bm and bc surfacing to manjeri - olipuzha road between km 0/000 to 16/200 - alignment stone laying and la survey work

Kiifb - manjeri olipuzha road- widening and providing bm and bc surfacing to manjeri - olipuzha road between km 0/000 to 16/200 - alignment stone laying and la survey work

Read more
Consultancy services preparation of survey plan, fixing of the alignment, preparation of gad, detailed hydraulic calculation, geotechnical investigation and feasibility report including preparing dpr work in district tonk

Consultancy services preparation of survey plan, fixing of the alignment, preparation of gad, detailed hydraulic calculation, geotechnical investigation and feasibility report including preparing dpr work in district tonk

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise