Tender Details
Particulars | Details |
---|---|
Title |
Tn 5390 Work Of On Line Safety Valve Setting By Trevi Testing Method In Boilers Of Kstps, Stage I To V, Unit 1 To 7 Kstps,Kota
|
Description |
Work Of On Line Safety Valve Setting By Trevi Testing Method In Boilers Of Kstps, Stage I To V, Unit 1 To 7 Kstps,Kota
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2025_RRVUN_457289_1 |
Reference Number |
TN-5390 |
Tender Fee | 1090 |
EMD | 13180 |
Tender Value | |
Place | Kota Super Thermal Power Station |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=820722 |
Start Date | April 22, 2025 17:30 |
End Date |
05/05/2025 ( Expired 8 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection, testing, commissioning of following works in nizamabad (erstwhile) district on turnkey basis. lot-i: 132/33kv ss pitlam (2x50mva ptrs) ii) 132kv dc/sc line (26.5km) from 220/132/33kv ss banswada to proposed 132/33kv ss pitlam iii) 132kv feeder bay at 220kv ss banswada lot-ii: (i) 220kv dc line (43km) from existing 220/132kv ss kamareddy to 220/11kv liss at yacharam thanda and connected 220kv bays
Supply, erection, testing and commissioning of following works in nizamabad (erstwhile) district on turnkey basis. lot-i: 132/33kv ss pitlam (2x50mva ptrs) ii) 132kv dc/sc line (26.5km) from 220/132/33kv ss banswada to proposed 132/33kv ss pitlam iii) 132kv feeder bay at 220kv ss banswada lot-ii: (i) 220kv dc line (43km) from existing 220/132kv ss kamareddy to 220/11kv liss at yacharam thanda ii) 1no. 220kv bay extension including bus extension at 220/132kv ss kamareddy (iii) 2nos. 220kv bay extensions at 220/11kv ss yacharam thanda (iv) 220kv bay extension at 220/132kv ss kamareddy
Read moreRenewal work by sdbc in the motor road for km 20 to 21 of karnaprayag simli gwaldam baijnath-bageshwar chaukodi-thal and km 5 6 7 8 of bageshwar -dafaut motor road and for km 1 of bageshwar-kapkot link motor road
Renewal work by sdbc in the motor road for km 20 to 21 of karnaprayag simli gwaldam baijnath-bageshwar chaukodi-thal and km 5 6 7 8 of bageshwar -dafaut motor road and for km 1 of bageshwar-kapkot link motor road
Read moreExe of works required for providing functional house hold tap connection including pipe line work making house hold connection in village rajasani 1 year defect liability period and hand over the system to vwhsc on the risk and cost
Exe of works required for providing functional house hold tap connection including pipe line work making house hold connection in village rajasani 1 year defect liability period and hand over the system to vwhsc on the risk and cost
Read moreWidening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)
Read moreWidening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)
Read more1. metalling of road from gram panchayat office to appasaheb harne wasti at pokhari, 2. c.c. road at gopalpur, 3. social hall in front of datta mandir jaypur, 4. c.d. work on smashan bhumi at chouka, 5. drainage line from parasram bagade to satt
1. metalling of road from gram panchayat office to appasaheb harne wasti at pokhari, 2. c.c. road at gopalpur, 3. social hall in front of datta mandir jaypur, 4. c.d. work on smashan bhumi at chouka, 5. drainage line from parasram bagade to satt
Read moreM/o sewerage (two year repair of non clog motor pump (submersible), 250 kva transformer starter, repair of sluice valve, reflex valve and lighting work in network sector-1 to 7, sps-2/5 and sumpwell) noida
M/o sewerage (two year repair of non clog motor pump (submersible), 250 kva transformer starter, repair of sluice valve, reflex valve and lighting work in network sector-1 to 7, sps-2/5 and sumpwell) noida
Read moreTn-5383 capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Read moreDetail survey and consultancy work for preparation of detailed project report (dpr) for construction of karanpur ghati road with safety walls in karanpur ghati on sh-123 km. 65/500 to 68/500 with sbc tests by bore on site design and drawing of sa
Detail survey and consultancy work for preparation of detailed project report (dpr) for construction of karanpur ghati road with safety walls in karanpur ghati on sh-123 km. 65/500 to 68/500 with sbc tests by bore on site design and drawing of sa
Read moreRestoration shifting of pipe line including testing and commissioning in between 57 km to 77 km pakage-iii on beripattan jhalas road deposit work
Restoration shifting of pipe line including testing and commissioning in between 57 km to 77 km pakage-iii on beripattan jhalas road deposit work
Read moreof your Industry type