Tender Details

Particulars Details
Title
Tn 5390 Work Of On Line Safety Valve Setting By Trevi Testing Method In Boilers Of Kstps, Stage I To V, Unit 1 To 7 Kstps,Kota
Description
Work Of On Line Safety Valve Setting By Trevi Testing Method In Boilers Of Kstps, Stage I To V, Unit 1 To 7 Kstps,Kota
Organisation RRVUN - CMD | State Govt. and UT
Tender Id 2025_RRVUN_457289_1
Reference
Number
TN-5390
Tender Fee 1090
EMD 13180
Tender Value
Place Kota Super Thermal Power Station
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=820722
Start Date April 22, 2025 17:30
End Date

05/05/2025 ( Expired 34 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tn-16086 supply of high pressure water jet pump alongwith accessories for cleaning of condenser tubes of unit 1 to 7 of kstps, kota.

Supply of high pressure water jet pump alongwith accessories for cleaning of condenser tubes of unit 1 to 7 of kstps, kota.

Read more
Testing of various numerical and electromagnetic relays installed in unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.

Testing of various numerical and electromagnetic relays installed in unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.

Read more
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Read more
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass

Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass

Read more
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Read more
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Read more
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Read more
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Read more
Biennial contract for online setting of floating pressure of safety valves by trevi test method for o and m work of unit 8 9 and 7 and oh of unit 9 bmd-i dtps htps kasimpur aligarh for two year

Biennial contract for online setting of floating pressure of safety valves by trevi test method for o and m work of unit 8 9 and 7 and oh of unit 9 bmd-i dtps htps kasimpur aligarh for two year

Read more
Work contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.

Work contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise