Tender Details

About Tender

🏭 Invitation For Bids: Deep Tube Well Construction Project 🏭 The Municipal Affairs Department, Representing The State Government And Union Territories, Invites Bids For The Sinking Of 8 Deep Tube Wells Using Upvc Pipes And Upvc Deep Well Screens, Including The Supply Of All Necessary Materials For The Water Supply Scheme (Wss) Under Amrut 2.0 At Memari Municipality. 📅 Bid Submission Deadline: July 12, 2024, 6:00 Pm Bid Security: Inr 300,000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, Adhering To The Guidelines And Standards Set Forth For Zone I V Under The Amrut 2.0 Program. Keywords: Deep Tube Well, Upvc Pipe, Upvc Deep Well Screen, Water Supply Scheme, Amrut 2.0, Memari Municipality, Municipal Affairs Department, Construction Project, Government Tender, Bid Submission
Particulars Details
Title
Sinking Of 8 Nos Deep Tube Well Using Upvc Pipe And Upvc Deep Well Screen Including Supply Of All Materials As Required Complete In All Respect And .................. Zone I V For Wss Under Amrut 2.0 At Memari Municipality.
Description
Sinking Of 8 Nos Deep Tube Well Using Upvc Pipe And Upvc Deep Well Screen Including Supply Of All&Amp#X0d Materials As Required Complete In All Respect And .................. Zone I V For Wss Under Amrut 2.0 At&Amp#X0d Memari Municipality.
Organisation MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT
Tender Id 2024_MAD_693011_1
Reference
Number
18 of SE (WC)/MED/2023-24 (3rd CALL)
Tender Fee 0
EMD 3 Lakh
Tender Value
Place Memari Municipality
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1509300
Start Date June 14, 2024 15:30
End Date

12/07/2024 ( Expired 314 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of rcc ohr of 800 cum capacity at zone- iii .................of all materials as required complete in all respect of proposed wss under amrut 2.0 at dainhat municipality.

Construction of rcc ohr of 800 cum capacity at zone- iii .................of all materials as&amp#x0d required complete in all respect of proposed wss under amrut 2.0 at dainhat municipality.

Read more
Construction of rcc ohr of 700 cum capacity at zone- i .................of all materials as required complete in all respect of proposed wss under amrut 2.0 at dainhat municipality.

Construction of rcc ohr of 700 cum capacity at zone- i .................of all materials as required complete in all respect of proposed wss under amrut 2.0 at dainhat municipality.

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Providing and laying public health service i.e. sewer pipeline in sec-3, mdc, panchkula. (providing and laying of sn 8 pipe 250mm and 450mm i/d including manhole complete in all respect as per satisfaction of engineer in charge)

Providing and laying public health service i.e. sewer pipeline in sec-3, mdc, panchkula. (providing and laying of sn 8 pipe 250mm and 450mm i/d including manhole complete in all respect as per satisfaction of engineer in charge)

Read more
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction of dws

Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction of dws

Read more
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction

Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction

Read more
Providing and laying of di pipe line in village haluwas devsar majra providing and fixing 1 no shallow tube well at fire brigade office in front of panchayat bhawan in bhiwani as per direction given by worthy dc bhiwani complete in all respect and al

Providing and laying of di pipe line in village haluwas devsar majra providing and fixing 1 no shallow tube well at fire brigade office in front of panchayat bhawan in bhiwani as per direction given by worthy dc bhiwani complete in all respect and al

Read more
Construction of 02 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nabaghunti kirtan math zone-39 asansol under amrut 2.0 phase-iii within amc

Construction of 02 nos rcc ohr along with land development approach road guard room and boundary&amp#x0d wall ....... in all respect of proposed water supply scheme at nabaghunti kirtan math zone-39 asansol&amp#x0d under amrut 2.0 phase-iii within amc

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de