Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Plan Pro.No 384 Kannanakuzhy Lps New Classroom Electrification
|
| Description |
Annual Plan Pro.No 384 Kannanakuzhy Lps New Classroom Electrification
|
| Organisation | Local Self Government Department | State Govt. and UT |
| Tender Id | 2025_LSGD_820499_1 |
|
Reference Number |
5/AE/LSGD/TGP/2025-26 |
| Tender Fee | 555 |
| EMD | 1849 |
| Tender Value | - |
| Place | THAMARAKULAM GP |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1375734 |
| Start Date | November 10, 2025 20:30 |
| End Date |
Expired
18/11/2025
Expired 285 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual plan-p no 520/27 repair work to vcb at ward 15 -in vallikkunnu gp
Annual plan-p no 520/27 repair work to vcb at ward 15 -in vallikkunnu gp
Read moreAnnual maintenance contract of servicing, overhauling and cleaning of exhaust hoods, filters, exhaust fans and grills in main kitchen and restaurant kitchen at hotel the ashok new delhi. (for two years)
Annual maintenance contract of servicing, overhauling and cleaning of exhaust hoods, filters, exhaust fans and grills in main kitchen and restaurant kitchen at hotel the ashok new delhi. (for two years)
Read moreTurn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Turn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Read moreProviding consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreTurnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Turnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Read moreAnnual plan pro.no 101/24 electrification of lps kuthirachira pmc,punalur electrification general electrical work
Annual plan pro.no 101/24 electrification of&#x0d lps kuthirachira pmc,punalur electrification general electrical work
Read moreAnnual plan -pro.no. 212/24-electrification and a.c. installation of new building (2nd floor)
Annual plan-pro.no.212/24-electrification and&#x0d a.c. installation of new building (2nd floor) kulathoopuzha gp
Read moreAnnual plan 2023 24 pro.no.55 construction of toilet block in aravukad lps
Annual plan 2023 24 pro.no.55 construction of toilet block in aravukad lps
Read moreAnnual plan-2024_2025 electrification of nanniyodu gp-electrification of pacha lps school-general electrical work
&#x0d annual plan-2024_2025 electrification of&#x0d nanniyodu gp-electrification of pacha lps&#x0d school-general electrical work&#x0d
Read moreAnnual plan-s0047/25-electrification of kv prayar lps at clapana gp
Annual plan-s0047/25-electrification of kv&#x0d prayar lps at clapana gp
Read moreof your Industry type