Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Structure Bonds Length 3.50 Mtr.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106382575 |
|
Reference Number |
81245690 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Bhubaneswar |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/072024/106382575/viewNitPdf_4612972.pdf |
| Start Date | June 20, 2024 18:49 |
| End Date |
Expired
01/07/2024
Expired 836 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening works on naina road to rajha tola approach road length 3.50 km, under sub division nagod.
Strengthening works on naina road to rajha tola approach road length 3.50 km, under sub division nagod.
Read morePalla wine shop to basantpur (length 4900 mtr.)
Palla wine shop to basantpur (length 4900 mtr.)
Read moreConstruction work of rairu gaon to waden ka pura to jor wale baba gangapur via payara singh pura road length 3.50 km. iind call
Construction work of rairu gaon to waden ka pura to jor wale baba gangapur via payara singh pura road length 3.50 km. iind call
Read moreVelcro tapes ( loop) of size width 25 mm and length 25 mtr.
Velcro tapes ( loop) of size width 25 mm and length 25 mtr.
Read morePrecast reinforced cement concrete line drain 650mm x 450mm and 1 mtr length
Precast reinforced cement concrete line drain 650mm x 450mm and 1 mtr length
Read moreConstruction of gram chopna to aakkheda road with external electrification of over head line/11 kv line/33 kv line/transformer shifting work (length 3.50 km)
Construction of gram chopna to aakkheda road with external electrification of over head line/11 kv line/33 kv line/transformer shifting work (length 3.50 km)
Read moreStrengthening of madwas railway station to bandhwa tola road length- 3.50 km., under pwd sub division. majhauli, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of madwas railway station to bandhwa tola road length- 3.50 km., under pwd sub division. majhauli, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening of satnara to bharihiya via etaunhi approach road length- 3.50 km., under pwd sub division. majhauli, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of satnara to bharihiya via etaunhi approach road length- 3.50 km., under pwd sub division. majhauli, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreHose, pvc, corr. , heavy duty,hose, synthetic rubber, size: 4 in x 6 mtr length
Hose, pvc, corr. , heavy duty,hose, synthetic rubber, size: 4 in x 6 mtr length
Read moreStrengthening of ramsajivan vishwakarma house to hirkini umariha approach road village ahiran tola length- 3.50 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of ramsajivan vishwakarma house to hirkini umariha approach road village ahiran tola length- 3.50 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreof your Industry type