Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Laying Of 100 Mm Raw Water Pipeline From Utility Plot No. Vii In Phase Iii To Plot No. N 7 In Phase Iv At Verna Industrial Estate.
|
Description |
Laying Of 100 Mm Raw Water Pipeline From Utility Plot No. Vii In Phase Iii To Plot No. N 7 In Phase Iv At Verna Industrial Estate.
|
Organisation | Goa Industrial Development Corporation | State Govt. and UT |
Tender Id | 2025_GIDCo_19885_1 |
Reference Number |
GIDC/GM (E)/Tender Notice/2024-25/A-5/B/3 |
Tender Fee | 10000 |
EMD | 72515 |
Tender Value | |
Place | Verna Industrial Estate. |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=20319 |
Start Date | February 07, 2025 16:30 |
End Date |
14/02/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreConstruction of rcc drain from bhalugadar talab to prajapati mohalla via abdul hussain house at ward no 7
Construction of rcc drain from bhalugadar talab to prajapati mohalla via abdul hussain house at ward no 7
Read moreConstruction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreLaying of pipe line from water supply and execution of other work in different location at site ward no. 49 near samadhiya colony hanuman bandh road etc. file no. 194/25x9/1
Laying of pipe line from water supply and execution of other work in different location at site ward no. 49 near samadhiya colony hanuman bandh road etc. file no. 194/25x9/1
Read moreSupply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreof your Industry type