Tender Details

Particulars Details
Title
Strengthening Of Embankment With Rcc For Monsoon Preparation Of Kocp, Hazaribagh Area
Description
Strengthening Of Embankment With Rcc For Monsoon Preparation Of Kocp, Hazaribagh Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_337199_1
Reference
Number
GM(H)/SO(C)/NIT/2025-26/03 Dated 10-06-2025
Tender Fee 0
EMD 11800
Tender Value -
Place KOCP, HAZARIBAGH AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349643

Start Date June 11, 2025 15:30
End Date
Expired 21/06/2025

Expired 437 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).

Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).

Read more
Dg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.

Dg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.

Read more
Providing consultancy services for preparation of dpr and construction drawings for all services including preparation of structural designs detail estimate and drawings along with all alied works of construction of bridge connecting belekeri port to harawada port in ankola taluk uttarakannada district under 5054-80-190-0-01-132 krdcl during 2026-27

Providing consultancy services for preparation of dpr and construction drawings for all services including preparation of structural designs detail estimate and drawings along with all alied works of construction of bridge connecting belekeri port to harawada port in ankola taluk uttarakannada district under 5054-80-190-0-01-132 krdcl during 2026-27

Read more
Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna

Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna

Read more
Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of koyyoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 13.80 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of koyyoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 13.80 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of dodderi block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 11.30 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of dodderi block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 11.30 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of sonandoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of sonandoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise