Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Creation Of 100 Kva Sub Station Along With Ht/Lt Network At Kp Road Anantnag. (Pddss2526100296)
|
| Description |
Creation Of 100 Kva Sub Station Along With Ht/Lt Network At Kp Road Anantnag. (Pddss2526100296)
|
| Organisation | DC-PDD | State Govt. and UT |
| Tender Id | 2025_PDD_283548_1 |
|
Reference Number |
20/EDA OF 2025-26 |
| Tender Fee | 500 |
| EMD | 14400 |
| Tender Value | - |
| Place | ANANTNAG |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872657 |
| Start Date | August 07, 2025 21:30 |
| End Date |
Expired
20/08/2025
Expired 417 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sitc of ht panels, main lt panel, lt cable and wiring work in new substation for new rio building at igims, patna
Sitc of ht panels, main lt panel, lt cable and wiring work in new substation for new rio building at igims, patna
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreConducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)
Read moreCreation of 100kva substation along with ht/lt network at kuchay mohalla manduna and creation of 100kva substation along with ht/lt network at narrow koil road, under ut capex for the year 2025-26
Creation of 100kva substation along with ht/lt network at kuchay mohalla manduna&#x0d and creation of 100kva substation along with ht/lt network at narrow koil road, under ut capex for the year 2025-26&#x0d
Read moreCreation of substations along with ht/lt network
Creation of substations along with ht/lt network&#x0d
Read moreCreation of substations along with ht/lt network
Creation of substations along with ht/lt network&#x0d
Read moreCreation of substations along with ht/lt network
Creation of substations along with ht/lt network&#x0d
Read moreCreation of substations along with ht/lt network
Creation of substations along with ht/lt network&#x0d
Read moreof your Industry type