Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation And Commissioning Of Ms Pipe Range In Panel No 6 And 7 Of Rvi Seam For Shcm Pakage In Cm Project At Nakrakonda Kumardihi B Colliery
|
| Description |
Installation And Commissioning Of Ms Pipe Range In Panel No 6 And 7 Of Rvi Seam For Shcm Pakage In Cm Project At Nakrakonda Kumardihi B Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_326604_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/24-25/ENM/400 Dt 22.01.2025 |
| Tender Fee | 0 |
| EMD | 24600 |
| Tender Value | - |
| Place | Nakrakonda Kumardihi B Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338530 |
| Start Date | January 22, 2025 23:30 |
| End Date |
Expired
01/02/2025
Expired 601 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation and commissioning of ms pipe range in panel no. 3,4,5 of rvi seam for shcm package in cm project at nakrakonda kumardihi b colliery under bankola area.
Installation and commissioning of ms pipe range in panel no. 3,4,5 of rvi seam for shcm package in cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreInstallation of booster pump in water line from reservoir to shcm package in rvi seam incline cleaning at nakrakonda kumardihi b colliery.
Installation of booster pump in water line from reservoir to shcm package in rvi seam incline cleaning at nakrakonda kumardihi b colliery.
Read moreWhite washing at travelling road of panel p6 in rvi seam of cm project under nakrakonda kumardihi b colliery
White washing at travelling road of panel p6 in rvi seam of cm project under nakrakonda kumardihi b colliery
Read more2 nos (two) drift drivage (140 m from rvi seam to rv seam and 290m from rvi seam to riv seam) at cm project under nakrakonda-kumardihi b colliery, bankola area
2 nos (two) drift drivage (140 m from rvi seam to rv seam and 290m from rvi seam to riv seam) at cm project under nakrakonda-kumardihi b colliery, bankola area
Read moreInstallation of 1000 mm wide x 200mtr long belt conveyor from 2l and minus 4d to 8d and minus 4d in rvi seam for shcm pakage of cm project at nakrakonda kumardihi b colliery under bankola area .
Installation of 1000 mm wide x 200mtr long belt conveyor from 2l and minus 4d to 8d and minus 4d in rvi seam for shcm pakage of cm project at nakrakonda kumardihi b colliery under bankola area .
Read moreInstallation of power setup behind load centre in p 7 p 8 and from rvi seam to rv seam of shcm package of cm project at nakrakonda kumardihi b colliery under bankola area.
Installation of power setup behind load centre in p 7 p 8 and from rvi seam to rv seam of shcm package of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreInstallation of 1000 mm wide x 200mtr long belt conveyor from 2l and minus 4d to 8d and minus 4d in rvi seam for shcm pakage of cm project at nakrakonda kumardihi b colliery under bankola area (retender).
Installation of 1000 mm wide x 200mtr long belt conveyor from 2l and minus 4d to 8d and minus 4d in rvi seam for shcm pakage of cm project at nakrakonda kumardihi b colliery under bankola area (retender).
Read moreConstruction of 5 nos sectionlisation stoppings at panel no 3 of rvi seam of cm project under nakrakonda kumardihi b colliery
Construction of 5 nos sectionlisation stoppings at panel no 3 of rvi seam of cm project under nakrakonda kumardihi b colliery
Read moreReplacement of old and damaged conveyor belt in rvi seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Replacement of old and damaged conveyor belt in rvi seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreDigging a staple pit from rvi seam to rv seam for establishment the ventilation circuit of rv seam of cm project under nakrakonda kumardihi b colliery.
Digging a staple pit from rvi seam to rv seam for establishment the ventilation circuit of rv seam of cm project under nakrakonda kumardihi b colliery.
Read moreof your Industry type