Tender Details
About Tender
🚆 Procurement Opportunity: Trd Work For Foot Over Bridge Under Amrit Bharat Scheme 🛖🚪 The Ministry Of Railways, Under The Central Government, Invites Bids For The Turnkey Railway Design (Trd) Work Associated With The Construction Of A 12 Meter Foot Over Bridge (Fob) Under The Amrit Bharat Scheme At Various Stations Within The Ratlam Division. 📅 Bid Submission Deadline: May 20, 2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 4,09,000 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Documents. This Project Is A Part Of The Amrit Bharat Scheme, Aimed At Enhancing The Safety And Accessibility Of Railway Stations. Keywords: Ministry Of Railways, Trd Work, Foot Over Bridge, Amrit Bharat Scheme, Government Tender, Construction, Railway InfrastructureParticulars | Details |
---|---|
Title |
Trd Work In Connection With Providing 12 Mtr. Foot Over Bridge Under Amrit Bharat Scheme At Various Stations Of Ratlam Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74786102 |
Reference Number |
EL-TRD-58-2023-24-09RT-1 |
Tender Fee | 0 |
EMD | 4.09 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74786102/viewNitPdf_4548503.pdf |
Start Date | April 25, 2024 17:12 |
End Date |
20/05/2024 ( Expired 385 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of foot over bridge at km.16/550 (karipatti) in salem to ulundurpet section of nh-79 in the state of tamil nadu
Construction of foot over bridge at km.16/550 (karipatti) in salem to ulundurpet section of nh-79 in the state of tamil nadu
Read more10 dyce ds circle ropar 2025 26
Providing gang for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds division under ds circle pspcl ropar on per day basis
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Construction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning of total 216 nos of 9-mtr solar led high mast at various locations in nagpur district in the state of maharashtra with five years comprehensive maintenance contract (cmc)
Survey, design, fabrication, supply, installation, testing, commissioning of total 216 nos of 9-mtr solar led high mast at various locations in nagpur district in the state of maharashtra with five years comprehensive maintenance contract (cmc)
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type