Tender Details

Particulars Details
Title
Tender For Carrying Out Repairing Of Rr Masonry Boundary Wall At Backside Of Boiler House, Canteen And Tank Farm
Description
As Per The File Attached
Organisation Hindustan Insecticides Limited | Central Govt. Ministry/Department
Tender Id 2024_HIL_781846_1
Reference
Number
R/CM/WRI-62/2383/2024-25
Tender Fee 0
EMD 0
Tender Value -
Place Rasayani
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1085985

Start Date December 16, 2024 22:45
End Date
Expired 31/12/2024

Expired 653 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i

Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i

Read more
Carrying out replacement of rr wall with rcc wall, modification of existing staircase, rcc works in substructure and superstructure, various miscellaneous works of civil, electrical, mechanical for rcnd pantry at rcnd stilt area at north site, barc.

Carrying out replacement of rr wall with rcc wall, modification of existing staircase, rcc works in substructure and superstructure, various miscellaneous works of civil, electrical, mechanical for rcnd pantry at rcnd stilt area at north site, barc.

Read more
Reg. for carrying out repair and renovation of external work of qtrs. no. a1 to a8 and b1 to b4 including boundary wall in pc sabzi mandi at north district, delhi

Reg. for carrying out repair and renovation of external work of qtrs. no. a1 to a8 and b1 to b4 including boundary wall in pc sabzi mandi at north district, delhi

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit 9070c26d19 lining up agency for carrying out tank m and i of intermediate tanks in iocl paradip refinery, as per tender

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit 9070c26d19 lining up agency for carrying out tank m and i of intermediate tanks in iocl paradip refinery, as per tender

Read more
Carrying out various electric works on turnkey basis under full deposit scheme to release new connection of 700 kva to general manager (jal), nagar nigam, mathura at dairy farm mps, near sudharshan park, mathura in the jurisdiction of se eudc mathura

Carrying out various electric works on turnkey basis under full deposit scheme to release new connection of 700 kva to general manager (jal), nagar nigam, mathura at dairy farm mps, near sudharshan park, mathura in the jurisdiction of se eudc mathura

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Carrying out repairing of rr masonry boundary wall of factory

Carrying out repairing of rr masonry boundary wall of factory

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise