Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tender For Carrying Out Repairing Of Rr Masonry Boundary Wall At Backside Of Boiler House, Canteen And Tank Farm
|
| Description |
As Per The File Attached
|
| Organisation | Hindustan Insecticides Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_HIL_781846_1 |
|
Reference Number |
R/CM/WRI-62/2383/2024-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Rasayani |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1085985 |
| Start Date | December 16, 2024 22:45 |
| End Date |
Expired
31/12/2024
Expired 653 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Read moreCarrying out replacement of rr wall with rcc wall, modification of existing staircase, rcc works in substructure and superstructure, various miscellaneous works of civil, electrical, mechanical for rcnd pantry at rcnd stilt area at north site, barc.
Carrying out replacement of rr wall with rcc wall, modification of existing staircase, rcc works in substructure and superstructure, various miscellaneous works of civil, electrical, mechanical for rcnd pantry at rcnd stilt area at north site, barc.
Read moreReg. for carrying out repair and renovation of external work of qtrs. no. a1 to a8 and b1 to b4 including boundary wall in pc sabzi mandi at north district, delhi
Reg. for carrying out repair and renovation of external work of qtrs. no. a1 to a8 and b1 to b4 including boundary wall in pc sabzi mandi at north district, delhi
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit 9070c26d19 lining up agency for carrying out tank m and i of intermediate tanks in iocl paradip refinery, as per tender
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit 9070c26d19 lining up agency for carrying out tank m and i of intermediate tanks in iocl paradip refinery, as per tender
Read moreCarrying out various electric works on turnkey basis under full deposit scheme to release new connection of 700 kva to general manager (jal), nagar nigam, mathura at dairy farm mps, near sudharshan park, mathura in the jurisdiction of se eudc mathura
Carrying out various electric works on turnkey basis under full deposit scheme to release new connection of 700 kva to general manager (jal), nagar nigam, mathura at dairy farm mps, near sudharshan park, mathura in the jurisdiction of se eudc mathura
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreTender for carrying out repairing of rr masonry boundary wall at backside of technical building
As per the file attached
Read moreCarrying out repairing of rr masonry boundary wall of factory
Carrying out repairing of rr masonry boundary wall of factory
Read moreof your Industry type