Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Construction Opportunity: Thulla Basti To Boie Road Project 🛣️🌉 The Public Works Department (Pwd), State Government And Union Territories, Invites Tenders For The Construction Of A Road From Thulla Basti To Boie, Spanning 5.715 Km, Including A 50.000 Metre Span Bridge In District Kangra, Himachal Pradesh. 🗺️ 🔨 The Project Scope Includes Formation Cutting, Passing Places, Rcc Drainage Works, Culverts, Sub Grade Works, Bituminous Macadam Works (Wbm Ii And Wbm Iii), Tarring Work, Side Drains, And Parapets. 🛠️ Tender Submission Deadline: April 04, 2024, 5:00 Pm Tender Fee: Inr 5000 Earnest Money Deposit (Emd): Inr 13,12,000 Interested Contractors Must Possess The Necessary Qualifications And Experience In Road Construction And Bridge Building, With A Focus On Adherence To Nabard Ridf Xxix Guidelines And Standards. Keywords: Construction, Road Project, Bridge, Pwd, State Government And Ut, Himachal Pradesh, Nabard Ridf Xxix, Tender, EmdParticulars | Details |
---|---|
Title |
Construction Of Road From Thulla Basti To Boie Km 0/000 To 5/715 Including 50.000 Metre Span Bridge In District Kangra (Hp) Under Ridf Xxix (Nabard)
|
Description |
Formation Cutting, Passing Place, R/Walls, C.D. Works, Gsb, Wbm Ii, Wbm Iii, Tarring Work, Side Drain And Parapets Including 50 Mtr Span Bridge And Five Year Routine Maintenance Under Nabard Ridf Xxix).
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_88658_1 |
Reference Number |
NIT No. 21764-74 DT. 11-03-2024- Shahpur |
Tender Fee | 5000 |
EMD | 13.12 Lakh |
Tender Value | |
Place | Shahpur |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=131589 |
Start Date | March 20, 2024 15:30 |
End Date |
04/04/2024 ( Expired 452 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstruction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreof your Industry type