Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Pitc And Handing Over Of Air Conditioning System In Basement, Ground Floor, First Floor And Fourth Floor At Divisional Library South Sector 34 U.T., Chandigarh.
|
Description |
Pitc And Handing Over Of Air Conditioning System In Basement, Ground Floor, First Floor And Fourth Floor At Divisional Library South Sector 34 U.T., Chandigarh.
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id | 2025_CHD_85444_1 |
Reference Number |
PH8/2025/2043162/43 |
Tender Fee | 0 |
EMD | 7.3 Lakh |
Tender Value | |
Place | Chandigarh |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=104919 |
Start Date | April 01, 2025 22:30 |
End Date |
02/05/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract (pbmc) of nh-05 from km 0.00 at crossing sector 34-35 to u.t. boundary km 6.415 and km 0.00 at crossing sector 34-35 to km 8.30 u.t. boundary zirakpur including service lanes except km 3.18 to km 4.83 u.t.
Performance based maintenance contract (pbmc) of nh-05 from km 0.00 at crossing sector 34-35 to u.t. boundary km 6.415 and km 0.00 at crossing sector 34-35 to km 8.30 u.t. boundary zirakpur including service lanes except km 3.18 to km 4.83 u.t
Read moreRepairs to lightening protection system and earthing system of equipements installed in technical and domestic bldgs and other misc works other than wsa at af stn chandigarh.
Repairs to lightening protection system and earthing system of equipements installed in technical and domestic bldgs and other misc works other than wsa at af stn chandigarh.
Read moreBiennial maintenance contract of central air conditioning system of ccr-1 and 2, gcr, technical building and administrative building (including supply of spares, refrigerant, consumables) under emiph-i at sgtpp.
Biennial maintenance contract of central air conditioning system of ccr-1 and 2, gcr, technical building and administrative building (including supply of spares, refrigerant, consumables) under emiph-i at sgtpp.
Read moreSupply installation, testing and commissioning sitc of vrvvrf air conditioning system for new under construction of office infrastructure for well services at 1st floor of laq building ongc mehsana asset
Supply installation, testing and commissioning sitc of vrvvrf air conditioning system for new under construction of office infrastructure for well services at 1st floor of laq building ongc mehsana asset
Read moreServicing of vrv air conditioner system (daikin and bluestar make) installed in various buildings at north and south campus of iit mandi.
Servicing of vrv air conditioner system (daikin and bluestar make) installed in various buildings at north and south campus of iit mandi.
Read moreAmc of ei,air conditioning, and allied installations work at the faculty fishery sciences, chakgaria , under south 24 pgs elec. div, pwd-annual prive and routine maintenance of the complete electrical installation, incl.sub-station.
Amc of ei,air conditioning, and allied installations work at the faculty fishery sciences, chakgaria , under south 24 pgs elec. div, pwd-annual prive and routine maintenance of the complete electrical installation, incl.sub-station.
Read moreProviding e i works replacement of ug cable switch disconnector fuse units for air conditioning system and main panel by pass system in assembly building agartala tripura west
Providing e i works replacement of ug cable switch disconnector fuse units for air conditioning system and main panel by pass system in assembly building agartala tripura west
Read moreE tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
Read moreDesign supply erection and commissioning of automatic fire detection and quenching system with bypass circuit at ground floor for conveyor 11a and 11b at bunker top 1 set
Design supply erection and commissioning of automatic fire detection and quenching system with bypass circuit at ground floor for conveyor 11a and 11b at bunker top 1 set
Read moreConstruction of meeting hall in first floor over the existing ground floor of barnoporichoi museum at the premises of paschim medinipu zilla parisad. (5th sfc)
Construction&#x0d of meeting&#x0d hall in first&#x0d floor over&#x0d the existing&#x0d ground floor&#x0d of&#x0d barnoporichoi&#x0d museum at the&#x0d premises of&#x0d paschim&#x0d medinipu zilla&#x0d parisad. (5th&#x0d sfc)
Read moreof your Industry type