🏭 Ntpc Limited Corrosion Mapping Project 🔬 Ntpc Limited, A Leading Public Sector Undertaking, Is Seeking Bids From Experienced Vendors For The Corrosion Mapping Of Water Wall Tubes In The 210 Mw Boiler At Ntpc Kahalgaon. 🏭 📅 Bid Submission Deadline: May 27, 2024, 3:00 Pm Tender Security: Inr 50,000 Interested Bidders Must Possess The Necessary Technical Expertise And Equipment To Perform The Corrosion Mapping With Precision. Detailed Proposals, Including Methodology, Timelines, And Pricing, Are To Be Submitted By The Stipulated Deadline. Keywords: Corrosion Mapping, Water Wall Tubes, Ntpc Limited, Public Sector Undertaking, Boiler Maintenance, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Corrosion Mapping Of Water Wall Tubes For Stage I(210 Mw Boiler) At Ntpc
|
| Description |
Corrosion Mapping Of Water Wall Tubes For Stage I(210 Mw Boiler) At Ntpc Kahalgaon.
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2024_NTPC_86986_1 |
|
Reference Number |
NTPC/USSC-CPG2/9900280762 |
| Tender Fee | 0 |
| EMD | 50000 |
| Tender Value | - |
| Place | NTPC Kahalgaon |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=90179 |
| Start Date | May 17, 2024 23:30 |
| End Date |
Expired
27/05/2024
Expired 869 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5253g work contract for conduction of rla (remaining life assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 mw unit at unit no 6, utp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5253g work contract for conduction of rla (remaining life assessment) of boiler pressure part and corrosion mapping of boiler tubes of 1x500 mw unit at unit no 6, utp..
Read moreProcurement of coal nozzle tips for boiler stage i (3x660mw) under
Procurement of coal nozzle tips for boiler stage i (3x660mw) undercapital budget 2026 27
Read moreProcurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Read moreRenovation and modernization of stage 1 boiler motorised and manual high pressure valves 2 x 500 mw rihand super thermal power station
Renovation and modernization of stage 1 boiler motorised and manual high pressure valves 2 x 500 mw rihand super thermal power station
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreof your Industry type