Tender Details

Particulars Details
Title
Repair Of Pal Lift Irrigation Scheme Stage I Construction Of Protection Wall Around Pal Lis Construction Of Approach Road At Pal And Idoli Lis Tal Karad Dist Satara
Description
Repair Of Pal Lift Irrigation Scheme Stage I Construction Of Protection Wall Around Pal Lis Construction Of Approach Road At Pal And Idoli Lis Tal Karad Dist Satara
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2024_CWRDP_1120625_1
Reference
Number
E Tender No.05, For 2024-25 (Pal Indoli)
Tender Fee 2860
EMD 1.23 Lakh
Tender Value
Place Indoli, Tal-Karad, Dist-Satara
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1956501
Start Date December 05, 2024 15:30
End Date

12/12/2024 ( Expired 178 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of approach road and other misc. civil works for residences at 220 kv s/s farrukhabad. (p.r. no. 1300065621/2025)

Construction of approach road and other misc. civil works for residences at 220 kv s/s farrukhabad. (p.r. no. 1300065621/2025)

Read more
Construction of boundary wall and rcc drain

Construction of boundary wall and rcc drain bus stand area vinova ward at pipariya dist. narmadapuram m.p.

Read more
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak

Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise