Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of H.L. Bridge At Km. 90.200 Of Nh 157 In The State Of Odisha On Epc Mode
|
| Description |
Reconstruction Of H.L. Bridge At Km. 90.200 Of Nh 157 In The State Of Odisha On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2026_MoRTH_903667_1 |
|
Reference Number |
14 CE NH of 2025-26 |
| Tender Fee | 11800 |
| EMD | 6.73 Lakh |
| Tender Value | - |
| Place | Phulbani |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=949847 |
| Start Date | March 26, 2026 00:25 |
| End Date |
Expired
08/05/2026
Expired 156 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreConstruction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreDesign, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Read moreConstruction of high level rcc bridge (16 x 29.85m) in place of old damaged bridge over kiul river at nariyana ghat on nh-333a in 72nd km of khaira-sono road in district of jamui.
Construction of high level rcc bridge (16 x 29.85m) in place of old damaged bridge over kiul river at nariyana ghat on nh-333a in 72nd km of khaira-sono road in district of jamui.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreDesign, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreSelection of system integrator for supply, installation, integration, testing, commissioning and operation & maintenance of electronic toll collection (etc) system including medium speed weigh-in-motion (mswim) and static weigh bridge (swb) system (a) at toll plaza rosera-baheri-singhia road near bariyahi ghat-2 lane bridge over river kareh in dist. darbhanga in the state of bihar. (b) at toll plaza near h.l. r.c.c. bridge on bishunpur atarwel road over arai ri
Selection of system integrator for supply, installation, integration, testing, commissioning and operation & maintenance of electronic toll collection (etc) system including medium speed weigh-in-motion (mswim) and static weigh bridge (swb) system (a) at toll plaza rosera-baheri-singhia road near bariyahi ghat-2 lane bridge over river kareh in dist. darbhanga in the state of bihar. (b) at toll plaza near h.l. r.c.c. bridge on bishunpur atarwel road over arai river in the district of darbhanga in the state of bihar (c) at toll plaza near baluaha ghat 2 lane bridge over river koshi in dist. saharsa in the state of bihar
Read moreDpr preparation for reconstruction of h.l. bridge in falgu river at km 24 of nh-22 (including complete land acquisition, forest clearance and utility shifting if any) in the state of jharkhand under epc mode
Dpr preparation for reconstruction of h.l. bridge in falgu river at km 24 of nh-22 (including complete land acquisition, forest clearance and utility shifting if any) in the state of jharkhand under epc mode
Read moreConstruction of shartmuqam bridge on epc mode
Construction of shartmuqam bridge &#x0d on epc mode&#x0d
Read moreof your Industry type