Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Offloading Otr Tyre Related Work Of Wheel Mounted Hem Ms (Dumper, Grader, Crane, Pay Loader, Tyre Handler, Water Sprinkler And Wheel Dozer) Of Khadia Project As Back Up Support For 730 Days.
|
| Description |
Offloading Otr Tyre Related Work Of Wheel Mounted Hem Ms (Dumper, Grader, Crane, Pay Loader, Tyre Handler, Water Sprinkler And Wheel Dozer) Of Khadia Project As Back Up Support For 730 Days.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_NCL_283791_1 |
|
Reference Number |
KHD / G.M. (Excv) / E-Tender / 23-24 / 365 |
| Tender Fee | |
| EMD | 43300 |
| Tender Value | |
| Place | NCL KHADIA PROJECT, SHAKTINAGAR |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 18, 2023 15:00 |
| End Date |
Expired
31/07/2023
Expired 1088 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Offloading otr tyre related work of wheel mounted hemms like dumpers graders cranes payloaders tyre handler water sprinklers and wheel dozer etc as back up support of workshop of khadia project for a period of two year 730 days
Offloading otr tyre related work of wheel mounted hemms like dumpers, graders, cranes, payloaders, tyre handler, water sprinklers and wheel dozer etc as back up support of workshop of khadia project for a period of two year 730 days.
Read moreOffloading the work of tyre mounting , de-mounting , dismantling , assembling , fitment , tyre inflation and tyre pressure checkup work of bh-100/85 dumper , water sprinkler , motor grader , crane , tyre handler , wheel dozer of krishnashila project
Offloading the work of tyre mounting , de-mounting , dismantling , assembling , fitment , tyre inflation and tyre pressure checkup work of bh-100/85 dumper , water sprinkler , motor grader , crane , tyre handler , wheel dozer of krishnashila project
Read moreOffloading work of replacement / fitment of safety glass in operator cabin of hemms (dumper, water sprinkler, crane, tyre handler) of khadia project for a period of one year.
Offloading work of replacement / fitment of safety glass in operator cabin of hemms (dumper, water sprinkler, crane, tyre handler) of khadia project for a period of one year.
Read moreOffloading the work of tyre mounting , de- mounting , dismantling , assembling fitment and tyre inflation and tyre pressure checkup of dumpers , water sprinklers , motor grader , crane , tyre handler , wheel dozer .
Offloading the work of tyre mounting , de- mounting , dismantling , assembling fitment and tyre inflation and tyre pressure checkup of dumpers , water sprinklers , motor grader , crane , tyre handler , wheel dozer .
Read moreHydraulic pressure and ultrasonic thickness testing and certification of air pressure vessels/tanks of dumper, shovel, drill, water sprinkler, tyre handler, grader, crane and stationary air compressor of kakri project.
Hydraulic pressure and ultrasonic thickness testing and certification of air pressure vessels/tanks of dumper, shovel, drill, water sprinkler, tyre handler, grader, crane and stationary air compressor of kakri project.
Read moreReplacement of wiper system in 07 nos. bd155/355 dozers, wd600 wheel dozer, bg825 grader, 988h pay loader, 02 no. d11t dozer, wa800 pay loader, til rt880 crane, escort rt40 crane and inspection of the same after 6 months at ashok ocp.
Replacement of wiper system in 07 nos. bd155/355 dozers, wd600 wheel dozer, bg825 grader, 988h pay loader, 02 no. d11t dozer, wa800 pay loader, til rt880 crane, escort rt40 crane and inspection of the same after 6 months at ashok ocp.
Read moreOffloading the work of refueling of various type of hemms including chain and tyre mounted sel equipment by two nos. sel bowsers of khadia project for a period of 365 days.
Offloading the work of refueling of various type of hemms including chain and tyre mounted sel equipment by two nos. sel bowsers of khadia project for a period of 365 days.
Read moreFabrication and fixing of step assembly with flexible ladders on auxiliary equipment loader wheel dozer water tanker grader and crane of rajmahal project
Fabrication and fixing of step assembly with flexible ladders on auxiliary equipment loader wheel dozer water tanker grader and crane of rajmahal project
Read moreCleaning of radiator assy. of dumper sl. no. 60397, 60428, 1124, 1010, 1060 and dozer sl. no. 13639, 13589, 13721, 13770, 104859, and motor grader sl. no. 3111, tyre handler sl. no. b18111, and crane sl. no. 408056.
Cleaning of radiator assy. of dumper sl. no. 60397, 60428, 1124, 1010, 1060 and dozer sl. no. 13639, 13589, 13721, 13770, 104859, and motor grader sl. no. 3111, tyre handler sl. no. b18111, and crane sl. no. 408056.
Read moreRepairing of wiper for dozer sl. no.13629, 13784, 11657 and wd 730, pay loader a7a00262 and motor grader 3244, 3253 and 3249 for clear visibility in monsoon season as and when required basis at gvp ph ii ocp
Repairing of wiper for dozer sl. no.13629, 13784, 11657 and wd 730, pay loader a7a00262 and motor grader 3244, 3253 and 3249 for clear visibility in monsoon season as and when required basis at gvp ph ii ocp
Read moreof your Industry type