Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Repairing And Fitting Of 06 Stage 6 Inch X 5 Inch Size, Pv Ii ,Mn P Make Pump Of Nakc Under Govindpur Area
|
| Description |
Complete Repairing And Fitting Of 06 Stage 6 Inch X 5 Inch Size, Pv Ii ,Mn P Make Pump Of Nakc Under Govindpur Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_284986_1 |
|
Reference Number |
BCCL/GA-III/AM (EnM) E-TENDER/2023-24/84 |
| Tender Fee | - |
| EMD | 2946 |
| Tender Value | - |
| Place | Govindpur Area Office |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 07, 2023 16:30 |
| End Date |
Expired
14/08/2023
Expired 1156 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rotating assembly complete for mnp est 200 by 250 centrifugal pump 160 lps head 120m
Rotating assembly complete for mnp est 200 by 250 centrifugal pump 160 lps head 120m
Read moreProcurement of raph complete seals set for tanda stage ii
Procurement of raph complete seals set for tanda stage ii
Read moreSupply and fitting of pin bush coupling with bolt and bush in pv 300 ventilation fan of khottadih colliery
Supply and fitting of pin bush coupling with bolt and bush in pv 300 ventilation fan of khottadih colliery
Read moreDismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Read moreAc complete wiring with fitting and repair with refilling gas of mpvy veh ba no 12r 009358a, 13r00935
Ac complete wiring with fitting and repair with refilling gas of mpvy veh ba no 12r 009358a, 13r00935
Read moreSnow clearance winter season for the year 2026-27 of rnb division kralpora stage - 06 as per annexure
Snow clearance winter season for the year 2026-27 of rnb division kralpora stage - 06 as per annexure
Read moreLed tubelight 20/22 watt. complete fitting and accessoried i/p 230 v, 50 hz, cool white colour, surf
Led tubelight 20/22 watt. complete fitting and accessoried i/p 230 v, 50 hz, cool white colour, surf
Read moreConstruction of permanent drain from wt-06 to wt-05 in mahaloi village area of ntpc lara stage-ii
Construction of permanent drain from wt-06 to wt-05 in mahaloi village area of ntpc lara stage-ii
Read moreGos mess repair and maintenance replacement of floor wall tiles plumbing sanitary fitting complete and distemper works of 06 nos toilet room no 104 105 106 107 108 and 112 of gos mess at 100 raf vastral ahmadabad
Gos mess repair and maintenance replacement of floor wall tiles plumbing sanitary fitting complete and distemper works of 06 nos toilet room no 104 105 106 107 108 and 112 of gos mess at 100 raf vastral ahmadabad
Read moreS/f of 06 nos. 9.5 mtr. long tower pole sp-39 alongwith 10 sqmm 2 core armoured cable, flood light fitting, switches etc. at diffrent place of zone-06, kanpur.
S/f of 06 nos. 9.5 mtr. long tower pole sp-39 alongwith 10 sqmm 2 core armoured cable, flood light fitting, switches etc. at diffrent place of zone-06, kanpur.
Read moreof your Industry type