Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Short Term Maintenance Work Btn Km 45.400 To 134.690 On Tranpatiyra Jamjodhpur Kalavad Road Of Nh151 K In The State Of Gujarat Under Ordinary Repairs Or Under Mand R At During 2023.2024
|
Description |
Short Term Maintenance Work Btn Km 45.400 To 134.690 On Tranpatiyra Jamjodhpur Kalavad Road Of Nh151 K In The State Of Gujarat Under Ordinary Repairs Or Under Mand R At During 2023.2024
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_766507_1 |
Reference Number |
06 of 2023.2024 |
Tender Fee | 10000 |
EMD | 7.36 Lakh |
Tender Value | |
Place | Gandhinagar |
Link | https://eprocure.gov.in |
Start Date | August 11, 2023 14:30 |
End Date |
26/09/2023 ( Expired 632 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreExecution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreof your Industry type