Tender Details
| Particulars | Details |
|---|---|
| Title |
General Action Plan 2026 27 Annual Maintenance Jungle Clearance And Removing Floating Body For Smooth Flow Of Water During Water Distribution In Vallikunnam Distributory From 0 M To 6777m
|
| Description |
General Action Plan 2026 27 Annual Maintenance Jungle Clearance And Removing Floating Body For Smooth Flow Of Water During Water Distribution In Vallikunnam Distributory From 0 M To 6777m
|
| Organisation | Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1045 |
| EMD | 11820 |
| Tender Value | 4.73 Lakh |
| Place | Kerala |
| Link | Login to view |
| Start Date | November 06, 2026 21:30 |
| End Date |
Open
16/11/2026
9 days left |
Bidding on this tender?
Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.
Can't bid on this alone?
Short of the turnover, experience or certification it asks for, or need a team where the work is? We'll find a JV, consortium or local partner.
Find a partner →Get tenders for your business
Tell us what you supply or do. We'll send you matching tenders and call you about them.
Free tender checklists for your industry →Similar Tenders
-
Generalaction plan 2026 27 annual maintenance of canal jungle clearance and removal of floating materials in right bank main canal from ch67790m to 69752m edappon distributory edappon minor 1 minor 2 mavila distributory mavila left minor and ulavukad
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closes 07/11/2026
View tender -
General-action plan 2026-2027-kip o and m annual maintenance work under the section 13 4 charummoodu - clearing jungle, silt and floating body removal pazhakulam distributory at ch 0 to 1315 m and its minors
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closes 07/11/2026
View tender -
General action plan 2026- 2027 kip o m annual maintenance work under the section 13/4 charumoodu clearing jungle silt and floating body removal for kurathikad distributory at ch 0 to 6800 m and its minorsgeneral civil work
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closes 11/11/2026
View tender -
General- action plan- 2026-27-annual maintenance -jungle clearance, removal of floating bodies for chavara distributary from ch 0m to 8500m, west kallada minor distributary from ch 0m to 2500m, and chamavila minor distributary
Action plan 2026-27-annual maintenance -jungle clearance, removal of floating bodies for chavara distributary from ch 0m to 8500m, west kallada minor distributary from ch 0m to 2500m, and chamavila minor distributary
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closes 16/11/2026
View tender -
General action plan 2026 27 kip lbmc annual maintenance of canals clearing light jungle removal of silt and removing floating bodies from lbmc ch 0 13500 m chakkiyara distributary 0 787 m karavaloor distributary 0 1840 m and rectification wo
During water distribution a huge quantity of floating bodies such as dead animal bodies dry leaves small branches of trees plantain stems plastic bottles, domestic waste and plastic waste flow through the canal
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KTRKRA · Kerala Closes 13/11/2026
View tender -
General-mvip-action plan 2026-27 engaging pump operators for lift irrigation scheme of koothattukulam distributory canal including labours for shutter operation and clearing floating material stagnated near to the trash nets after flush escape
Irrigation Department | CE,P II, TVPM | SE,Proj.Cir., MVTPZHA | EE,MVIP Div,Piravom · Kerala Closes 13/11/2026
View tender -
General-action plan 2026-2027-kip o m -annual maintenance work under the section 13 4 charumoodu clearing jungle ,silt and floating body removal for nediyapadam north canal from ch 0 to 7340m-general civil work
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closes 07/11/2026
View tender -
General action plan 2026 27 kip rbmc clearing light jungle and removal floating materials from rbmc from ch 0m to 16950m coming under the jurisdiction of kip rb section 4/2 thenmala in connection with water distribution through the canal workge
During water distribution huge quantity of floating bodies like slaughter waste , animal bodies, dry leaves, small branches of trees, plantain stem, plastic bottle, domestic waste, and plastic wastes etc are carried by the flowing water
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KTRKRA · Kerala Closes 16/11/2026
View tender -
General - ap 2026-27- kip o m annual maintenance work under the section 13 / 4 charummoodu clearing jungle silt and floating body removal vancheeswaram at ch 0 to 1710 m edakkunnam at 0 to 740 m distributory and its minors and campus cleaning
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closes 11/11/2026
View tender -
General action plan 2026 27 annual maintenance jungle clearance and removing floating body for smooth flow of water during water distribution in vallikunnam distributory from 0m to 6777m general civil work
Irrigation Department | CE,P II, TVPM | SE,Proj. Cir.,KTRKRA | EE,KIP,KLM · Kerala Closed 19/10/2026
View tender