Tender Details

About Tender

🚂 Geotechnical Study And Design Services For Railway Construction Project 📐 The Ministry Of Railways, Central Government, Invites Bids From Experienced Consultants For Conducting Geotechnical Studies And Preparing Detailed Drawings And Designs For The Construction Of A New Railway Section In Jaipur, In Lieu Of Existing Line Construction Number 93 Awr Re. 📅 Bid Submission Deadline: May 27, 2024, 3:00 Pm Bid Security: Inr 87600 Interested Consultants Should Submit Detailed Proposals, Including Technical Capabilities, Experience, And Financial Bids, In Accordance With The Tender Document For A Comprehensive Understanding Of The Project Scope. Keywords: Geotechnical Study, Railway Construction, Detailed Drawings, Design, Ministry Of Railways, Central Government, Tender, Consultancy Services
Particulars Details
Title
Carrying Out Geotechnical Stus, Preparation Of Construction Of With Lhs &Amp Preparing Detailed Drawings &Amp Design In Connection With Lieu Of Existing Lc No.93 Awr Re Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74895610
Reference
Number
NWRSCCivil-102140544
Tender Fee 0
EMD 87600
Tender Value -
Place Jaipur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74895610/viewNitPdf_4555182.pdf

Start Date May 05, 2024 00:44
End Date
Expired 27/05/2024

Expired 872 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc

Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc

Read more
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.

(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.

Read more
(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of new lhs in lieu of lc gate no. 28 at km 14 / 39 - 41 at az-nht section under aen/az. (iii) construction of new lhs in lieu of lc gate no. 32 at km 9/23-25 in az-nht section under aen/az.

(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of new lhs in lieu of lc gate no. 28 at km 14 / 39 - 41 at az-nht section under aen/az. (iii) construction of new lhs in lieu of lc gate no. 32 at km 9/23-25 in az-nht section under aen/az.

Read more
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.

Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.

Read more
(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae

(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae

Read more
Provision of lhs 2.00 x 5.00 m x 5.00 m in lieu of lc no. b-58 at km 78/8-9 on the asr-ptk section under aden/ptk

Provision of lhs 2.00 x 5.00 m x 5.00 m in lieu of lc no. b-58 at km 78/8-9 on the asr-ptk section under aden/ptk

Read more
(a) rajkot division - providing lhs in lieu of lc no. 92 at km 698/1-2 between lxr-wkr (b) rajkot division: provision of rub/lhs at lc no 26 (km 604/0-1), 33 (km 616/8-9), 41 (km 632/3-4), 42(633/9-634/0), 49 (km640/2-3) (c ) rajkot division:-viramgam -okha: - provision of rub/lhs at lc no 25 at km 602/9-603/0, (d) rajkot division: provision of rub/lhs at lc no 61 (km 657/4-5), 65 (km 663/2-3),66(664/5-6), 80(km 687/2-3), 81 (km 688/7-8), (e) rajkot division: provision of rub/lhs at lc

(a) rajkot division - providing lhs in lieu of lc no. 92 at km 698/1-2 between lxr-wkr (b) rajkot division: provision of rub/lhs at lc no 26 (km 604/0-1), 33 (km 616/8-9), 41 (km 632/3-4), 42(633/9-634/0), 49 (km640/2-3) (c ) rajkot division:-viramgam -okha: - provision of rub/lhs at lc no 25 at km 602/9-603/0, (d) rajkot division: provision of rub/lhs at lc no 61 (km 657/4-5), 65 (km 663/2-3),66(664/5-6), 80(km 687/2-3), 81 (km 688/7-8), (e) rajkot division: provision of rub/lhs at lc

Read more
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Read more
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work

Read more
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise