Tender Details

Particulars Details
Title
Construction Of 40 Nos. Of Ventilation Stoppings By Brickwork At Propose Section I Dist. 134 Nl, 130 Nl, 134 Sl Dist. H.R. Section I And Main Dip Of Orient Colliery Mine No. 1 And 2, Osa, Oa, Mcl.
Description
Construction Of 40 Nos. Of Ventilation Stoppings By Brickwork At Propose Section I Dist. 134 Nl, 130 Nl, 134 Sl Dist. H.R. Section I And Main Dip Of Orient Colliery Mine No. 1 And 2, Osa, Oa, Mcl.
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 72300
Tender Value
Place ORIENT COLLIERY MINE NO. 1 and 2
Link

AAAAAAAAAA

Login to view
Start Date June 24, 2025 15:30
End Date

09/07/2025 ( 15 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.

Construction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.

Read more
Construction of 46 nos. ventilation stopping at 19le panel and 25le panel in seam-ii of katkona 1 and 2 incline.

Construction of 46 nos. ventilation stopping at 19le panel and 25le panel in seam-ii of katkona 1 and 2 incline.

Read more
Construction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine

Construction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine

Read more
Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)

Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)

Read more
Fabrication with fixing/grouting of i love (symbol) orient and great place to work mahanadi coalfields limited (made of 3mm acp and acrylic 3d letters installed on 4 nos of ms square grid and making of glow sign board) at ecopark, mine no. 4,oa

Fabrication with fixing/grouting of i love (symbol) orient and great place to work mahanadi coalfields limited (made of 3mm acp and acrylic 3d letters installed on 4 nos of ms square grid and making of glow sign board) at ecopark, mine no. 4,oa

Read more
Construction of paved shoulder both side along the internal road of char emli section no.1 and 2 infront of b,c,d and e-type bunglow bhopal

Construction of paved shoulder both side along the internal road of char emli section no.1 and 2 infront of b,c,d and e-type bunglow bhopal

Read more
Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs

Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs

Read more
Package 6 renewal of b.t. surface at 1.nh colony 9th cross street, 2.nh colony 4th cross street, 3.nh colony 5th cross street, 4.nh colony 6th cross street, 5.nh colony 2nd cross street, 6.noble street and 7.thomas west main road in ward no. 40 42

Package 6 renewal of b.t. surface at 1.nh colony 9th cross street, 2.nh colony 4th cross street, 3.nh colony 5th cross street, 4.nh colony 6th cross street, 5.nh colony 2nd cross street, 6.noble street and 7.thomas west main road in ward no. 40 42

Read more
Engaging 2 nos. of watchman for section office at mullur in pudukkottai and engaging 1 no. of watchman for shopping complex at salai road in trichy for the period from 01.07.2025 to 31.03.2026

Engaging 2 nos. of watchman for section office at mullur in pudukkottai and engaging 1 no. of watchman for shopping complex at salai road in trichy for the period from 01.07.2025 to 31.03.2026

Read more
Provn of 04 x deep freezer (02 x deep freezer for aoc mess and 02 x deep freezer for dsc mess) of 23 fad and provn of 05 x soakage well at guard post no 8, 11, 14 near mag no 1 (t-61) and mag no 2 (t-60) of 23 fad (main), suranussi , under age (i) su

Provn of 04 x deep freezer (02 x deep freezer for aoc mess and 02 x deep freezer for dsc mess) of 23 fad and provn of 05 x soakage well at guard post no 8, 11, 14 near mag no 1 (t-61) and mag no 2 (t-60) of 23 fad (main), suranussi , under age (i) su

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise