Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
33 Kv Horn Gap Fuse Sets With Pi
|
| Description |
33 Kv Horn Gap Fuse Sets With 2 X24 Kv Post Insulators (Un Assembled)
|
| Organisation | Jodhpur VVNL - MD | State Govt. and UT |
| Tender Id | 2026_JdVVN_553127_1 |
|
Reference Number |
TN-2151 |
| Tender Fee | 4450 |
| EMD | 1.02 Lakh |
| Tender Value | - |
| Place | SE_MMC_JDVVNL_JODHPUR |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=985487 |
| Start Date | April 21, 2026 00:05 |
| End Date |
Expired
28/04/2026
Expired 148 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Read moreHiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read more33 kv horn gap fuse set with 2x24 kv pi (un-assembled)
33 kv horn gap fuse set with 2x24 kv pi (un-assembled)
Read more11 kv horn gap fuse sets
11 kv horn gap fuse sets with post 1x24 kv insulators (un-assembled) along with one no. extra 24 kv post insulator with 100 sets or part thereof as spare
Read moreSupply of 33 kv horn gap fuse sets with 2x24 kv post insulator (un-assembled) and 11 kv horn gap fuse sets with 1x24 kv post insulator (un-assembled)
Supply of 33 kv horn gap fuse sets with 2x24 kv post insulator (un-assembled) and 11 kv horn gap fuse sets with 1x24 kv post insulator (un-assembled)
Read more11 kv horn gap fuse sets with post insulator
11 kv horn gap fuse sets with post insulator (un-assembled)
Read moreof your Industry type