Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps
|
| Description |
Up Keeping And Scrap Removal At Various Locations In Turbine Maintenance Division Of Units 1 And 2 As And When Required During The Year 2025 26
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 582671 |
|
Reference Number |
58/2024-25 of SE/EM-II/Stg-1/BTPS |
| Tender Fee | 259 |
| EMD | 11000 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | March 20, 2025 01:30 |
| End Date |
Expired
27/03/2025
Expired 569 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreSupply of painting items on as and when required basis
Supply of painting items on as and when required basis
Read moreSupply of medicines / drugs on as and when required basis
Supply of medicines / drugs on as and when required basis
Read moreRepair of internal mines road with wbm materials as and when required during monsoon year 2027 at hingula ocp under hingula area
Repair of internal mines road with wbm materials as and when required during monsoon year 2027 at hingula ocp under hingula area
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreKtps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Read moreSupply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Read moreInstallation wbm work at various locations within the council outer areas as required.
Installation wbm work at various locations within the council outer areas as required.
Read moreProcurement of required components and restoration of flow signal mode at igl odorizing units
Procurement of required components and restoration of flow signal mode at igl odorizing units
Read moreof your Industry type