Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Rollers With Bracket Assembly For Bottom Ash Conveyors.
|
| Description |
Procurement Of Rollers With Bracket Assembly For Bottom Ash Conveyors.
|
| Organisation | NLC Tamilnadu Power Ltd | Public Sector Undertakings |
| Tender Id | 2425110019 |
|
Reference Number |
2425110019 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Tuticorin |
| Link |
View Original Tender Notice
https://procure.nlcindia.in/nib/specification/2425110019 |
| Start Date | July 01, 2024 22:43 |
| End Date |
Expired
06/08/2024
Expired 716 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreProcurement of idlers for bottom ash conveyors.
Procurement of idlers for bottom ash conveyors.
Read moreTtps mech ii ahp reconditioning of wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper
Ttps mech ii ahp reconditioning of wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper
Read moreTtps mech ii ahp reconditioning of wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper
Ttps mech ii ahp reconditioning of wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper
Read moreof your Industry type