Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Balance Civil And Electrical Repairs To The Auditorium, Main College Campus In Rangaraya Medical College, Kakinada District(1st Call)
|
Description |
Balance Civil And Electrical Repairs To The Auditorium, Main College Campus In Rangaraya Medical College, Kakinada District(1st Call).
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 769978 |
Reference Number |
4-1/APMSIDC/SE-ELR/PA/TA/2024-25/Dt.23.11.2024 |
Tender Fee | 2717 |
EMD | 76727 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | November 26, 2024 15:30 |
End Date |
10/12/2024 ( Expired 210 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreCleaning and repairs to area drainage, sewage system including cleaning of septic tanks by mechanical means in zone b and e area under ge chennai
Cleaning and repairs to area drainage, sewage system including cleaning of septic tanks by mechanical means in zone b and e area under ge chennai
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)
Read moreAAAAAAAAAA
Login to viewConstruction of paver block road from college more to panitanki more via high school more under panikouri gp, rajganj block in the district of jalpaiguri. (length-1000.00 m, width-3.75 m)
Read moreWidening and strengthening work of 04 lane road from the main gate of maa pateshwari devi temple to balrampur sugar mill in tulsipur vidhan sabha of balrampur district
Widening and strengthening work of 04 lane road from the main gate of maa pateshwari devi temple to balrampur sugar mill in tulsipur vidhan sabha of balrampur district
Read moreConstruction of new hospital building in medical college campus satna district satna (mp)
Construction of new hospital building in medical college campus satna district satna (mp) including water supply, sanitary fitting and electrification (first call)
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreof your Industry type