Tender Details

Particulars Details
Title
Construction Of Pcc Drain Wall In The Left Out Portion Of Pallavoikkal At Sivagami Nagar Main Road, Reddiyarpalayam Revenue Village, Oulgaret Constituency, Puducherry.
Description
Construction Of Pcc Drain Wall In The Left Out Portion Of Pallavoikkal At Sivagami Nagar Main Road, Reddiyarpalayam Revenue Village, Oulgaret Constituency, Puducherry.
Organisation Public Works Department | State Govt. and UT
Tender Id 2025_PWDC2_19508_1
Reference
Number
TN.86/PW/IRRN/2025-2026
Tender Fee 525
EMD 31413
Tender Value -
Place Puducherry
Link
View Original Tender Notice

https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19887

Start Date August 18, 2025 21:45
End Date
Expired 28/08/2025

Expired 413 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Left out portion of nh-27 at polaikalan ch. 0/2500

Left out portion of nh-27 at polaikalan ch. 0/2500

Read more
Renewal of left out portion of nh-8 (balicha to kaya existing byepass) from km 281, 400 to km 286.00 distt. udaipur

Renewal of left out portion of nh-8 (balicha to kaya existing byepass) from km 281, 400 to km 286.00 distt. udaipur

Read more
Construction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)

Construction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)

Read more
Special repair/emergent repair work for the left out portion of nh-120 (dumraon bazar) from ch. 240.200 to ch. 245.400 (excluding portion of 940m handed over to bsrdcl) for the year 2026-27.

Special repair/emergent repair work for the left out portion of nh-120 (dumraon bazar) from ch. 240.200 to ch. 245.400 (excluding portion of 940m handed over to bsrdcl) for the year 2026-27.

Read more
Feasibility study and preparation of detailed project report for one time improvement (oti) work for left out bypassed section at raniganj town portion from ch 275.20 km to ch. 280.700 km (punjabi more) of nh-14(erstwhile nh-60)

Feasibility study and preparation of detailed project report for one time improvement (oti) work for left out bypassed section at raniganj town portion from ch 275.20 km to ch. 280.700 km (punjabi more) of nh-14(erstwhile nh-60)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Formation and wbm grade-i to the left out road portion of 1st cross street of kalyana suntharamoorthy nagar, reddiyarpalayam in oulgaret constituency

Formation and wbm grade-i to the left out road portion of 1st cross street of kalyana suntharamoorthy nagar, reddiyarpalayam in oulgaret constituency

Read more
Formation and providing grade i to the left out streets of sms nagar in oulgaret constituency.

Formation and providing grade i to the left out streets of sms nagar in oulgaret constituency.

Read more
Construction of rcc deck slab over existing vayalveli nagar pcc drain in pallavoikkal junction connecting to mariyal nagar, reddiyarpalayam revenue village, oulgaret constituency, puducherry.

Construction of rcc deck slab over existing vayalveli nagar pcc drain in pallavoikkal junction connecting to mariyal nagar, reddiyarpalayam revenue village, oulgaret constituency, puducherry.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise