Tender Details
Particulars | Details |
---|---|
Title |
Rla Studies Of Hp Outer Casing And Esv Casings Of 67.5 Mw Steam Turbine At Hindalco, Hirakud
|
Description |
Rla Studies Of Hp Outer Casing And Esv Casings Of 67.5 Mw Steam Turbine At Hindalco, Hirakud
|
Organisation | Bharat Heavy Electricals Limited (BHEL) |
Tender Id | 2023_BHEL_28144_1 |
Reference Number |
ES/K/2023/WC/18 |
Tender Fee | 0 |
EMD | 9840 |
Tender Value | |
Place | Hyderabad |
Link | https://eprocurebhel.co.in |
Start Date | September 01, 2023 16:30 |
End Date |
11/09/2023 ( Expired 638 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Read moreRound the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreSupervisory control and testing of samples from boiler, turbine, wctp and tbs at wctp laboratory.
Supervisory control and testing of samples from boiler, turbine, wctp and tbs at wctp laboratory.
Read moreProcurement of spares of lp turbine shaft sealing and casing assembly for overhauling of unit no 9, dtps, htps, kasimpur
Procurement of spares of lp turbine shaft sealing and casing assembly for overhauling of unit no 9, dtps, htps, kasimpur
Read moreAnnual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Annual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Read moreCleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Read moreSupply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam
Supply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam
Read moreSpecial repair to rusted water supply pipe line within aats alongwith submersible bore well of 7.5 hp motor, provn of 01 x 7.5 hp motar alongwith ro water plant and provn of 01 x submersible bore well with connected pipe line and accessories at aats
Special repair to rusted water supply pipe line within aats alongwith submersible bore well of 7.5 hp motor, provn of 01 x 7.5 hp motar alongwith ro water plant and provn of 01 x submersible bore well with connected pipe line and accessories at aats
Read moreS and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
Read moreErection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13
Erection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13 btps obra
Read moreof your Industry type