Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Paver Surface Over Kutcha Road From Cuttack Chandbali Road To Madhabananda Pond Existing C.C. Road At Sriram Colony, Immam Nagar, Jagatpur In Ward No.49.
|
Description |
Construction Of Paver Surface Over Kutcha Road From Cuttack Chandbali Road To Madhabananda Pond Existing C.C. Road At Sriram Colony, Immam Nagar, Jagatpur In Ward No.49.
|
Organisation | Government of Odisha |
Tender Id | 2023_ORULB_96204_20 |
Reference Number |
MC(CMC)CTC_Div-II_No39/2023-24 |
Tender Fee | 4720 |
EMD | 8600 |
Tender Value | |
Place | Bikash Bhawan,Jagannath Lane,Badambadi-753012 |
Link | https://tendersodisha.gov.in |
Start Date | December 04, 2023 16:30 |
End Date |
14/12/2023 ( Expired 551 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of rcc drain at ward no 45 main road conveyer belt to ashok panday house
Construction of rcc drain at ward no 45 main road conveyer belt to ashok panday house
Read moreConstruction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Read moreConstruction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Construction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Read moreof your Industry type