Tender Details
Particulars | Details |
---|---|
Title |
Work Of Repairing Of Both End Bearing Housing, Checking Of Rotor For Any Run Out And Attending Etc Balancing Of Rotor, Normalization Of Vibration And Complete Assembly Of Jyoti Make 6.6 Kv, 435 Kw Acw Pump Motor For Unit 3 And 4 At Ssgts, Mppgcl, Brs.
|
Description |
Work Of Repairing Of Both End Bearing Housing, Checking Of Rotor For Any Run Out And Attending Etc Balancing Of Rotor, Normalization Of Vibration And Complete Assembly Of Jyoti Make 6.6 Kv, 435 Kw Acw Pump Motor For Unit 3 And 4 At Ssgts, Mppgcl, Brs.
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2025_MPPGC_396638_1 |
Reference Number |
396638 |
Tender Fee | 795 |
EMD | 6400 |
Tender Value | |
Place | SGTPS, MPPGCL, Birsinghpur |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=472465 |
Start Date | February 07, 2025 23:30 |
End Date |
25/02/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle mpm ii acp stage i, ii iii cleaning of filters, greasing of bearings, aligning of v belts, checking of bearing performance, conducting static balancing test and renewing of fan blades tie rods, if any failure occurs etc
Ttps operation circle mpm ii acp stage i, ii iii cleaning of filters, greasing of bearings, aligning of v belts, checking of bearing performance, conducting static balancing test and renewing of fan blades tie rods, if any failure occurs etc
Read moreWork of repairing of both end bearing housing, checking of rotor for any run-out and attending etc balancing of rotor, normalization of vibration and complete assembly of jyoti make 6.6kv, 435 kw acw pump motor for unit 3 and 4 at ssgts, mppgcl, brs.
Work of repairing of both end bearing housing, checking of rotor for any run-out and attending etc balancing of rotor, normalization of vibration and complete assembly of jyoti make 6.6kv, 435 kw acw pump motor for unit 3 and 4 at ssgts, mppgcl, brs.
Read moreFabrication and rough casting of ci barrel for bearing 4000/3000/2000gpm(ii)and fabrication casting machining of 02 no.of motor housing end cover(dala) bearing cap of 160kw motor
Fabrication and rough casting of ci barrel for bearing cover of 4000/3000/2000 gpm pumps and motor etc.(size 9inch o.d x 1.5 inch thickness) 16 nos. sbc(ii)and fabrication (casting machining) of 2 nos. of motor housing end cover(dala) and 3 n
Read moreSupply and delivery of various mandatory spares for 220/6.6kvpower transformers, 3000kw/6.6kv vertical and hsc pump sets like prvs, rvts, 6.6kv capacitors, thrust bearing housing assembly packing box assembly and de and nde bearing
Supply and delivery of various mandatory spares for 220/6.6kv power transformers, 3000kw/6.6kv vertical and hsc pump sets like prvs, residual voltage transformers (rvts), 6.6kv capacitors, thrust bearing housing assembly packing box assembly and de and nde bearings etc., for raw pumping stations at murmur, and bommakal under gdwss, ph-i under sd-iv(electrical), transmission division.iv, control room
Read moreTtps- echp-ii- checking and inspection of all the secondary crusher free end side and fixed end side bearing at rotor side and drive motor side at sc-1a, 2a, sc-1b sc-2b and replace at sch-ii.
Ttps- echp-ii- checking and inspection of all the secondary crusher free end side and fixed end side bearing at rotor side and drive motor side at sc-1a, 2a, sc-1b sc-2b and replace at sch-ii.
Read more(1)fabrication of 08 nos. ventilation fan blade of (model-pv-160) and providing and fitting of block, bearing belt etc.and frame and fitting at kpc 2 seam akwmc.(2)repairing of 160 hp motor housing both end cover sl.no. im/160/02 at aarc under akwmc
(1)fabrication of 08 nos. ventilation fan blade of (model-pv-160) and providing and fitting of block, bearing belt etc.and frame and fitting at kpc 2 seam akwmc.(2)repairing of 160 hp motor housing both end cover sl.no. im/160/02 at aarc under akwmc
Read moreA)repairing/new making of 02 nos. bearing housing of 320 kw motor, 6.6 kv, make-russian and b)part repairing and reconditioning of 37 kw rotor, 1460 rpm, 415 volt, 3 ph, 50 hz induction motor at kathara washery b) new making of end cover dala both s
A)repairing/new making of 02 nos. bearing housing of 320 kw motor, 6.6 kv, make-russian and b)part repairing and reconditioning of 37 kw rotor, 1460 rpm, 415 volt, 3 ph, 50 hz induction motor at kathara washery b) new making of end cover dala both s
Read moreAnnual rate contract for metalizing of motor bearing housing, rotor shaft journal, rotor trueness checking and dynamic balancing for a period of 2 years
Annual rate contract for metalizing of motor bearing housing, rotor shaft journal, rotor trueness checking and dynamic balancing for a period of 2 years
Read moreComplete overhauling of ht motor stator and caca cooler assembly refurbishment of ht motor rotor and bearing housing assembly supply of spares and other accessories with installation testing and commissioning of ht motor of mip 1630 at win platform
Complete overhauling of ht motor stator and caca cooler assembly refurbishment of ht motor rotor and bearing housing assembly supply of spares and other accessories with installation testing and commissioning of ht motor of mip 1630 at win platform
Read moreSuspension tube assembly complete except roller bearing for traction motor type tao 659. (only item-003 to 009) details of items as given below: 1) tube drg.no.skel-4513 (003)-1no. 2) bearing housing drg.no.10q-745-381 alt-c (004)-1no. 3) adjustment washer drg.no.10q-745-382 alt-d (005)-1no. 4) end cover (rwe) drg.no.10q-745-383 alt-b (006)-1no. 5) abutment piece drg.no.10q-745-384 alt-b (007)-1no. 6) end cover (gwe) drg.no.elw/bsl/2/wam4/f88.156 alt-nil (008)-1no. 7) enclosure (gwe) d
For complete deion and other details, please refer to tender
Read moreof your Industry type