Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Replacement Of Old Damaged Air Pipe Lines At Bhakra Dam
|
Description |
Replacement Of Old Damaged Air Pipe Lines At Bhakra Dam
|
Organisation | Bhakra Beas Management Board | Public Sector Undertakings |
Tender Id | 2024_BBMB_207149_1 |
Reference Number |
55/BM/24 |
Tender Fee | 2360 |
EMD | 1.64 Lakh |
Tender Value | |
Place | Bhakra Dam |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=226518 |
Start Date | September 05, 2024 14:30 |
End Date |
30/01/2025 ( Expired 158 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read moreLt/b885-078-pm-t-9801/1001 - coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period
Read moreConstruction of c.c. road and culvert with hume pipe at village baraua ramadhar ke khet se sobran singh tak zone 25. ward no.66 file no.210/25x3/6.
Construction of c.c. road and culvert with hume pipe at village baraua ramadhar ke khet se sobran singh tak zone 25. ward no.66 file no.210/25x3/6.
Read moreReplacement of existing 132kv s3 tower at loc.no.107 with new 220kv ac0 type tower (emc) for improving ground clearance between tower loc.no.106-107 of 132kv jubilee hills - chandrayanagutta dc feeder
Replacement of existing 132kv s3 tower at loc.no.107 with new 220kv ac0 type tower (emc) for improving ground clearance between tower loc.no. 106-107 of 132kv jubilee hills-chandrayanagutta dc feeder
Read moreSupply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Supply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Read moreComp maint of control panels, drivers, gear trolly, chain pully block and allied wks alongwith repair /replacement to doors, windows, flooring and related b/r wks at various e/m installations at common area and nad area under age b/r-ii at ns karanja
Comp maint of control panels, drivers, gear trolly, chain pully block and allied wks alongwith repair /replacement to doors, windows, flooring and related b/r wks at various e/m installations at common area and nad area under age b/r-ii at ns karanja
Read moreOverhauling of e.s.p. including cleaning of fields hoppers, repair replacement of damaged parts of e.s.p. of unit-03 of 3x210 mw, atps anpara
Overhauling of e.s.p. including cleaning of fields hoppers, repair replacement of damaged parts of e.s.p. of unit-03 of 3x210 mw, atps anpara
Read moreWork of replacement of damaged gasket of hv/lv bushings and turrets and attending leakage from oil pipelines of 132/33kv, 40 mva t/f-2 (bhel make ) installed at 132 kv sub station sarila under etd hamirpur.
Work of replacement of damaged gasket of hv/lv bushings and turrets and attending leakage from oil pipelines of 132/33kv, 40 mva t/f-2 (bhel make ) installed at 132 kv sub station sarila under etd hamirpur.
Read moreof your Industry type