Tender Details
About Tender
🛣️ Invitation For Bids: Road Upgradation Project In Samuthiram Panchayat 🛣️ The Rural Development And Panchayat Raj Department Of The State Government And Ut Invites Bids For The Upgradation Of The Samuthiram Samanthampatti Road To Muthaliyamman Koil Road, From Km 0/0 To Km 0/560 In Samuthiram Panchayat, Arimalam Block, Pudukkottai District. 📅 Bid Submission Deadline: July 12, 2024, 3:00 Pm Tender Fee: Inr 0 Emd: Inr 15,000 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Road Upgradation, Infrastructure, Samuthiram Panchayat, Arimalam Block, Pudukkottai District, Rural Development And Panchayat Raj Department, Government Tender, Earnest Money DepositParticulars | Details |
---|---|
Title |
Mgsmt 2024 25 Pudukkottai Dist Package No 25 Arimalam Block Upgradation To The Samuthiram Samanthampatti Road To Muthaliyamman Koil Road Km 0/0 0/560 In Samuthiram Panchayat
|
Description |
Mgsmt 2024 25 Pudukkottai Dist Package No 25 Arimalam Block Upgradation To The Samuthiram Samanthampatti Road To Muthaliyamman Koil Road Km 0/0 0/560 In Samuthiram Panchayat&Amp#X0d
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id | 2024_RDTN_460393_1 |
Reference Number |
PDK_MGSMT_2024_25_25_ALM |
Tender Fee | 0 |
EMD | 15000 |
Tender Value | |
Place | ARIMALAM BLOCK |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=547265 |
Start Date | July 05, 2024 14:30 |
End Date |
23/07/2024 ( Expired 303 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreIe services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Ie services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Read moreIe services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreIe services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Ie services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Read moreConstruction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreConstruction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreof your Industry type