Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
To Strengthen The Cleaning System Of Fateh Sagar Lake, The Work Of Labour Through The Contractor
|
| Description |
To Strengthen The Cleaning System Of Fateh Sagar Lake, The Work Of Labour Through The Contractor
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_UITUD_376093_1 |
|
Reference Number |
NIT_61_01 |
| Tender Fee | 500 |
| EMD | 88440 |
| Tender Value | |
| Place | UDA Udaipur |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | December 07, 2023 19:30 |
| End Date |
Expired
15/12/2023
Expired 930 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreComprehensive maintenance including day to day repair lodged through online complaint mngt system/offline order with scope of leakage/seepagein any point of bldg, mechnical, electrical, and other works at digiana under ge kaluchak.
Comprehensive maintenance including day to day repair lodged through online complaint mngt system/offline order with scope of leakage/seepagein any point of bldg, mechnical, electrical, and other works at digiana under ge kaluchak.
Read moreComprehensive maintenance including day to day repair lodged through online complaint mngt system/offline order with scope of mechanical, electrical, summer and winter appliance, plumbing, joinery etc at y stn under age br ii of ge satwari
Comprehensive maintenance including day to day repair lodged through online complaint mngt system/offline order with scope of mechanical, electrical, summer and winter appliance, plumbing, joinery etc at y stn under age br ii of ge satwari
Read moreRepair and cleaning of sewage line and allied work at af stn arjan singh under ge (af) panagarh
Repair and cleaning of sewage line and allied work at af stn arjan singh under ge (af) panagarh
Read moreSupply of daily labour at various sites of river training wing for carry out miscelleneous works for the period of two years from the date of placement of work order
Supply of daily labour at various sites of river training wing for carry out miscelleneous works for the period of two years from the date of placement of work order.
Read moreRepair / repalcement of amf panel, yield test of bore, cleaning of bore, maintenance of pump house and allied work at af stn bhowali.
Repair / repalcement of amf panel, yield test of bore, cleaning of bore, maintenance of pump house and allied work at af stn bhowali.
Read moreLeftover work for provn of ground exploitation system of aew and c at af stn borjhar
Leftover work for provn of ground exploitation system of aew and c at af stn borjhar
Read more8306 cleaning of oh/ug sump, service tank including replacement of water tanks and connected work at naval dockyard under ge kunjali
8306 cleaning of oh/ug sump, service tank including replacement of water tanks and connected work at naval dockyard under ge kunjali
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type