Tender Details
Particulars | Details |
---|---|
Title |
Work Of Maintenance Of Rising Pipeline And All Distribution Pipeline Of Urban Water Supply Scheme Malpura, Sub Division Malpura
|
Description |
Work Of Maintenance Of Rising Pipeline And All Distribution Pipeline Of Urban Water Supply Scheme Malpura, Sub Division Malpura
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1500 |
EMD | 28117 |
Tender Value | |
Place | Executive Engineer PHED Division Malpura |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 22:00 |
End Date |
12/06/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRound the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreBiennial maintenance contract for helium leak detection test of unit89
Biennial maintenance contract for work of online helium leak detection test of condenser and related negative pressure parts of 2x250 of unit no 8 9 dtps htps kasimpur aligarh
Read moreWork of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.
Work of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.&#x0d
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreBiennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps
Read moreConstruction of two nos. of employee residential buildings at ps 3, jorhat, assam including electrification works and supply of all materials except cement
Construction of two nos. of employee residential buildings at ps 3, jorhat, assam including electrification works and supply of all materials except cement
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreof your Industry type