Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Custom Bid Invitation: Soil Investigation And Consultancy Services 🌱 The Department Of Military Affairs, Ministry Of Defence, Is Seeking Proposals For Soil Investigation And Consultancy Services To Design A Retaining Wall To Prevent Landslides. 🌉 🗓️ Submission Deadline: May 17, 2024, 3:00 Pm Service Providers With Expertise In Geotechnical Engineering And Landslide Mitigation Are Invited To Submit Detailed Proposals, Including Methodologies, Timelines, And Cost Estimates. Keywords: Soil Investigation, Consultancy, Retaining Wall, Landsl, Department Of Military Affairs, Ministry Of Defence, Government Tender| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Soil Investigation And Consultancy For Provn Of Retaining Wall For Landsl
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4850822 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 26, 2024 19:44 |
| End Date |
Expired
17/05/2024
Expired 877 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | ALLIED ENGINEERS | 16-05-2024 17:06:53 | MSE | Disqualified |
| 2 | ANKUR DUBEY DESIGN ASSOCIATES | 21-05-2024 18:47:57 | MSE | Qualified |
| 3 | AVINYA GREEN CONSTRUCTIONS | 17-05-2024 08:11:35 | MSE | Qualified |
| 4 | BUILDING CREATORS AND CONSULTING | 16-05-2024 16:44:43 | MSE | Qualified |
| 5 | FORMATION ENGINEERING CONSULTANCY | 03-05-2024 10:58:14 | N/A | Qualified |
| 6 | landscape designer | 06-05-2024 20:40:12 | MSE | Disqualified |
| 7 | MNEXT SOLUTIONS PRIVATE LIMITED | 03-05-2024 17:43:14 | MSE | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ANKUR DUBEY DESIGN ASSOCIATES( MSE Social Category:General ) | Item Categories : Custom Bid for Services - Soil investigation and consultancy for Provn of retaining wall for landsl | 91000.00 | L1 |
| 2 | BUILDING CREATORS AND CONSULTING( MSE Social Category:OBC ) | Item Categories : Custom Bid for Services - Soil investigation and consultancy for Provn of retaining wall for landsl | 157000.00 | L2 |
| 3 | AVINYA GREEN CONSTRUCTIONS( MSE Social Category:General ) | Item Categories : Custom Bid for Services - Soil investigation and consultancy for Provn of retaining wall for landsl | 171000.00 | L3 |
| 4 | FORMATION ENGINEERING CONSULTANCY | Item Categories : Custom Bid for Services - Soil investigation and consultancy for Provn of retaining wall for landsl | 650000.00 | L4 |
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreProvn of upvc doors at hq cif (r) under age (i) cif (r ).
Provn of upvc doors at hq cif (r) under age (i) cif (r ).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreComprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreConsultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.
Read moreConstruction of retaining wall along outfall drain/road h-block street no. 16 and hamdard school (regd. no. 359-a) in sangam vihar assembly constituency ac-49
Construction of retaining wall along outfall drain/road h-block street no. 16 and hamdard school (regd. no. 359-a) in sangam vihar assembly constituency ac-49
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type