Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Onetime Repairing Of The Deck Surface Of The Brace Bridge And Swing Bridge And Its Both Side Approaches As Not Covered In The Previous Work
|
| Description |
Onetime Repairing Of The Deck Surface Of The Brace Bridge And Swing Bridge And Its Both Side Approaches As Not Covered In The Previous Work
|
| Organisation | Kolkata Port Trust | Central Govt. Ministry/Department |
| Tender Id | 2024_KoPT_831201_1 |
|
Reference Number |
SMPK/KDS/CIV/T/2895/77 |
| Tender Fee | 2950 |
| EMD | 4.67 Lakh |
| Tender Value | |
| Place | Brace Bridge and Swing Bridge Kolkata |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=873438 |
| Start Date | October 19, 2024 19:30 |
| End Date |
Expired
09/11/2024
Expired 582 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under the state sector, surface coating and signage work of various roads of ward no. 05 dhorankhas in mussoorie assembly constituency of dehradun district by dbm/bc. (remaining work through debitable agency)
Under the state sector, surface coating and signage work of various roads of ward no. 05 dhorankhas in mussoorie assembly constituency of dehradun district by dbm/bc. (remaining work through debitable agency)
Read moreWbpwd/r/ee/s24pgshd/nit-02 of 2026-2027 by ee
Chakberia - bhojerhat road from 4.55 km to 10.69 km, emergent repairing and maintenance work in different stretches under south 24-parganas highway division in the dist of south 24-parganas.
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreOnetime repairing of the deck surface of the brace bridge and swing bridge and its both side approaches as not covered in the previous work
Onetime repairing of the deck surface of the brace bridge and swing bridge and its both side approaches as not covered in the previous work
Read moreRepairing of both side upper and lower brace arm of dozer sl no- t-13722
Repairing of both side upper and lower brace arm of dozer sl no- t-13722
Read moreRepair of prestressed box girder concrete bridge at bajaura over river beas alongwith both side approaches
Replacement of expansion joint, providing and laying wearing coat, priming coat mastic asphalt wearing priming coat providing and laying busg tack coat bm and bc in approaches cement paint and construction of u-shape drain etc.
Read moreComplete repairing of both side frame assly. lhs and rhs arm eye new making, lhs and rhs bracket welding, carrier roller foundation, brace arm crack repairing, welding and groove making in both side cracked shaft of track frame assly. transmission gu
Complete repairing of both side frame assly. lhs and rhs arm eye new making, lhs and rhs bracket welding, carrier roller foundation, brace arm crack repairing, welding and groove making in both side cracked shaft of track frame assly. transmission gu
Read moreRepairing of both side platform and railing, battery box, both side chain cutting, both side sprocket and five roller dismantling and fitting and manpower supply for the above work in tata 2060 shovel in adic kusunda area
Repairing of both side platform and railing, battery box, both side chain cutting, both side sprocket and five roller dismantling and fitting and manpower supply for the above work in tata 2060 shovel in adic kusunda area
Read moreRepairing of both side undercarriage body diagonal and main arm mounting brackets connected with blade, cylinder stay assy. and chassis upper portion, broken brace arm, partial repairing of blade assy. and track chain link both side of dozer 11902.
Repairing of both side undercarriage body diagonal and main arm mounting brackets connected with blade, cylinder stay assy. and chassis upper portion, broken brace arm, partial repairing of blade assy. and track chain link both side of dozer 11902.
Read moreRepair and maintenance of various bridges in una sub-divn.no.i hp.pwd. una (sh painting on lalsingi bridge foot bridge near dav school and ms railing including painting on both side approaches of rampur bridge)
Repair and maintenance of various bridges in una sub-divn.no.i hp.pwd. una (sh painting on lalsingi bridge foot bridge near dav school and ms railing including painting on both side approaches of rampur bridge)
Read moreof your Industry type