Tender Details

About Tender

🚂 Procurement Notice: Door Operating System For Bobyn Wagon 🚃 The Ministry Of Railways, Specifically The Central Government Ministry/Department, Has Issued A Tender For The Procurement Of A Door Operating System For Bobyn Wagons As Per Rdso's Specification Drg.No. Sk 77549. 📅 Submission Deadline: July 11, 2024, 10:55 Am Interested Vendors Must Submit Their Bids With All Necessary Documentation And Compliance With The Tender Specifications By The Stipulated Deadline. Keywords: Door Operating System, Bobyn Wagon, Rdso, Ministry Of Railways, Tender, Procurement, Central Government Ministry/Department
Particulars Details
Title
Supply, Fitment, Installation And Commissioning Of Heavy Duty Electrical Wire Rope Hoist With Trolley.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106394343
Reference
Number
51245365
Tender Fee 0
EMD 12550
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/092024/106443007/viewNitPdf_4680881.pdf

Start Date August 14, 2024 20:03
End Date
Expired 02/09/2024

Expired 771 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Over head wire rope suspension assy consisting of 6 mm galvanised wire rope‘ d’ link rope clamp

Over head wire rope suspension assy consisting of 6 mm galvanised wire rope‘ d’ link rope clamp

Read more
Manufacture, supply, erection, testing and commissioning of heavy duty, high lift 5t capacity wire rope electrical trolley at 90m elevation for lifting of scaffolding and other maintenance material in unit-1.

Manufacture, supply, erection, testing and commissioning of heavy duty, high lift 5t capacity wire rope electrical trolley at 90m elevation for lifting of scaffolding and other maintenance material in unit-1.

Read more
Steel wire rope for 15ton hoists

Steel wire rope for 15ton hoists

Read more
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.

Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.

Read more
Purchase of ushamartin make steel wire rope

Purchase of ushamartin make steel wire rope

Read more
Nit/pom-101067 for wire rope for eot crane

Supply of wire rope for eot cranes and electric hoists for 250mw, unit-8, ptps, panipat.

Read more
Supply of wire rope for chp-iii, ptps, panipat.

Supply of wire rope for chp-iii, ptps, panipat.

Read more
Bright steel wire rope 8mm dia with fibre core 120kg 2m to 180kg 2m,wire rope 12mm construction 6x36 rh lay,wire rope 10mm construction 6x36 lh lay,wire rope 20mm dia construction 6 x 36 rh lay fibre core is 2266 1989,wire rope 6mm dia construction 6 x 36 rh lay fibre core us 2266 1989,wire rope 18mm lh lay fibre core construction 6x36 or 6x37 with steel core length 100m dia 18mm,wire rope 16mm 6 37 const fiber tensile strength dia 16mm construction 6 37 fibre core rh lay 1770n mm2 approx mass 88.6

Bright steel wire rope 8mm dia with fibre core 120kg 2m to 180kg 2m,wire rope 12mm construction 6x36 rh lay,wire rope 10mm construction 6x36 lh lay,wire rope 20mm dia construction 6 x 36 rh lay fibre core is 2266 1989,wire rope 6mm dia construction 6 x 36 rh lay fibre core us 2266 1989,wire rope 18mm lh lay fibre core construction 6x36 or 6x37 with steel core length 100m dia 18mm,wire rope 16mm 6 37 const fiber tensile strength dia 16mm construction 6 37 fibre core rh lay 1770n mm2 approx mass 88.6

Read more
Repairing of guide roller along with its foundations, repairing of coupling of crowd, hoist generator, propel motor and hoist motor, repairing of final drive and repairing of take up axle along with repairing of steel sleeves and fitment in ekg 593

Repairing of guide roller along with its foundations, repairing of coupling of crowd, hoist generator, propel motor and hoist motor, repairing of final drive and repairing of take up axle along with repairing of steel sleeves and fitment in ekg 593

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise