Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ytps
|
| Description |
Tggenco Ytps(5 X800 Mw) Ci Ii Testing, Calibration, Servicing Of Pneumatic And Hydraulics Actuators, Mo Vs And Other Ci Instrumentation In Tg, Tg Auxiliaries, Ups And Batteries, Condensate Polishing Unit In The Service Vessel Area And Compressed Air System Of Unit 2 Of Yadadri Thermal Power Station, Veerlapalem For The Period Of 01.04.2025 Or From The Actual Date Of Commencement Of Work To 31.03.2026 For The Fy 2025 26
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 603991 |
|
Reference Number |
e- 10/ SE/ EM/Stage-I/ YTPS/2025-26 |
| Tender Fee | 350 |
| EMD | 14822 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | June 06, 2025 23:30 |
| End Date |
Expired
11/06/2025
Expired 494 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-(5x800mw) ytps-providing plantation in the area between ash pond and tungapadu vagu (part-i) on the d/s of ash pond at (5x800mw) yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.
Tggenco-(5x800mw) ytps-providing plantation in the area between ash pond and tungapadu vagu (part-i) on the d/s of ash pond at (5x800mw) yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.
Read moreTggenco-ytps(5x800mw)-construction of cabins for o and m staff shift operations various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Tggenco-ytps(5x800mw)-construction of cabins for o and m staff shift operations various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreof your Industry type