Tender Details

Particulars Details
Title
Day To Day Maintenance Of Matanhy Saldanha Administrative Complex At Margao In Fatorda Constituency For A Period Of 3 Years (Re Tender).
Description
Day To Day Maintenance Of Matanhy Saldanha Administrative Complex At Margao In Fatorda Constituency For A Period Of 3 Years (Re Tender).
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2025_PWD_21412_1
Reference
Number
PWD/Div8/ASW/2001/01/25-26/L1
Tender Fee 16000
EMD 1.58 Lakh
Tender Value
Place Fatorda
Link https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=21843
Start Date April 04, 2025 20:30
End Date

07/04/2025 ( Expired 91 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.

Supply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.

Read more
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years

Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years

Read more
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).

Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Read more
Annual maintenance contract for the 6 nos. of electrical substation at voc port for a period of 2 years and extendable one year

Annual maintenance contract for the 6 nos. of electrical substation at voc port for a period of 2 years and extendable one year

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room

Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room

Read more
Special repair to nabha bir dosanjah road odr059 l-5.95 km under head-5054 rb-10 in distt patiala including maintenance of road for five year one year defect liability period and four year maintenance period

Special repair to nabha bir dosanjah road odr059 l-5.95 km under head-5054 rb-10 in distt patiala including maintenance of road for five year one year defect liability period and four year maintenance period&amp#x0d

Read more
Maintenance of 3 nos. 100 mw hydro generator units of chamera ii power station karian distt. chamba h.p for two years i.e. 2025-26 to 2026-27

Maintenance of 3 nos. 100 mw hydro generator units of chamera ii power station karian distt. chamba h.p for two years i.e. 2025-26 to 2026-27

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise