Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Desludging/Overhauling Of 03 No, 3 Phase 50 Mva 132/33k V Power Transformers (Bhel Make) Along With The Other Allied Works At 200 Mva, 132/33k V Bemina Gss Srinagar Falling Under Operational Control Of Tlmd I, Bemina (Complete Job)
|
| Description |
Desludging/Overhauling Of 03 No, 3 Phase 50 Mva 132/33k V Power Transformers (Bhel Make) Along With The Other Allied Works At 200 Mva, 132/33k V Bemina Gss Srinagar Falling Under Operational Control Of Tlmd I, Bemina (Complete Job)
|
| Organisation | DC-PDD | State Govt. and UT |
| Tender Id | 2025_PDD_274784_1 |
|
Reference Number |
18/JKPTCL/TLMD-I/SGR/2024-25 Dated 24.03.2025 |
| Tender Fee | 3000 |
| EMD | 3.2 Lakh |
| Tender Value | |
| Place | Bemina Srinagar |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847641 |
| Start Date | March 25, 2025 21:30 |
| End Date |
Expired
26/04/2025
Expired 418 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Desludging/overhauling of 03no 3-phase 50mva 132/33kv power transformers bhel make along with the other allied works at 200mva 132/33kv bemina gss srinagar falling under operational control of tlmd-i bemina
Desludging/overhauling of 03no 3-phase 50mva 132/33kv power transformers bhel make along with the other allied works at 200mva 132/33kv bemina gss srinagar falling under operational control of tlmd-i bemina
Read moreOverhauling cum oil leakage arresting of 132/33kv 50mva areva make power transformer (transformer no.03, sl. no.teja6675/2006) installed at 132/33kv gss garhwa road.
Overhauling cum oil leakage arresting of 132/33kv 50mva areva make power transformer (transformer no.03, sl. no.teja6675/2006) installed at 132/33kv gss garhwa road.
Read moreAnnual maintenance contract for carrying out the preventive/routine/breakdown maintenance of various 132/33kv grid substations and allied 132kv transmission lines falling under the jurisdiction of tlmd i bemina
Annual maintenance contract for carrying out the preventive/routine/breakdown maintenance of various 132/33kv grid substations and allied 132kv transmission lines falling under the jurisdiction of tlmd i bemina
Read moreDesign, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss
Design, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss p
Read moreAnnual maintenance contract for carrying out the prive/routine/breakdown maintenance of various 132/33kv grid sub-stations and allied 132kv transmission lines falling under the jurisdiction of tlmd i, bemina for the year 2025-26
Annual maintenance contract for carrying out the prive/routine/breakdown maintenance of various 132/33kv grid sub-stations and allied 132kv transmission lines falling under the jurisdiction of tlmd i, bemina for the year 2025-26
Read moreReplacement and commissioning of new battery charger and battery bank (110v,200ah), ac and dc board , 33kv vcbs , 132 kv and 33 kv pts, 33kv cts, servo voltage stabilizer 250 kva and power cables replacement along with allied works at gss bb-i
Replacement and commissioning of new battery charger and battery bank (110v,200ah), ac and dc board , 33kv vcbs , 132 kv and 33 kv pts, 33kv cts, servo voltage stabilizer 250 kva and power cables replacement along with allied works at gss bb-i
Read moreOverhauling work of kanohar make 150 mva, 220/132 kv auto transformer including complete testing and other allied work of power transformer at 220/132/33 kv gss ulijhari (chaibasa-i)
Overhauling work of kanohar make 150 mva, 220/132 kv &#x0d auto transformer including complete testing and other allied work of power &#x0d transformer at 220/132/33 kv gss ulijhari (chaibasa-i)
Read moreRepairs maintenance to ht 33kv sf6 breakers, 11 kv vcbs and rmus, 33/11 kv power transformers, 11 kv/433 volts distribution transformers, ht cable, joint kits along with connected allied works at nstl under age i rnd nstl, visakhapatnam and main
Repairs maintenance to ht 33kv sf6 breakers, 11 kv vcbs and rmus, 33/11 kv power transformers, 11 kv/433 volts distribution transformers, ht cable, joint kits along with connected allied works at nstl under age i rnd nstl, visakhapatnam and main
Read moreManning operation and maintenance of (i) 132/6.6 kv substation having 2 nos of 10/16mva power transformers along with allied equipment required spares at peddapur 132/6.6kv station under eam cell-ii, peddapur, omdivision no.viii . (ii) 11/3.3 kv substation having 2 nos of 1 1000kva power transformers along with allied equipment and 11/3.3 kv pumping stations having 3 nos of 220 kw/3.3 kv vt and 1 no 110 kw/3.3kv pumpsets along with allied equipment at jack well, singoor under eam cell-ii,
Manning, operation and maintenance of (i) 132/6.6 kv substation having 2 nos of 10/16mva power transformers along with allied equipment required spares at peddapur 132/6.6 kv substation under eam cell-ii, peddapur, omdivision no.viii,patancheru (ii) 11/3.3 kv substation having 2 nos of 1000 kva power transformers along with allied equipment and 11/3.3kv/ pumping stations having 3 nos of 220 kw/3.3 kv vt and 1 no 110 kw/3.3 kv pumpsets along with allied equipment at jack well, singoor under eam cell-ii, peddapur, om division no.viii, patancheru for a period of one(1) year
Read moreConstruction of extension of control room (2nd phase) for office use at kalyani 132/33 kv substations, wbsetcl and (b) boring and installing 3 h.p. 15 stage submersible type new pump in boring along with suitable pipe line allied works inside sub st
Construction of extension of control room (2nd phase) for office use at kalyani 132/33 kv substations, wbsetcl and (b) boring and installing 3 h.p. 15 stage submersible type new pump in boring along with suitable pipe line allied works inside sub st
Read moreof your Industry type