Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing Of Input Shaft And Intermediate Pinion Shaft (Worn Out Teeth) Of Gear Box Of C4 Conveyor In All Respect, Repairing Of The Fluid Coupling T12 12 And Removal Of The Bearing And Gear Coupling Of The Drive Shaft Including Shifting Of All The Ma
|
Description |
Repairing Of Input Shaft And Intermediate Pinion Shaft (Worn Out Teeth) Of Gear Box Of C4 Conveyor In All Respect, Repairing Of The Fluid Coupling T12 12 And Removal Of The Bearing And Gear Coupling Of The Drive Shaft Including Shifting Of All The Ma
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_MCL_333963_1 |
Reference Number |
PO(BOCP)/ENM/ETender/252602 |
Tender Fee | 0 |
EMD | 2690 |
Tender Value | |
Place | PO office, Bharatpur OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346201 |
Start Date | April 11, 2025 15:30 |
End Date |
21/04/2025 ( Expired 64 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of crowd intermediate shaft, crowd motor base plate, tie bar, bearing housing, driven-driving coupling and miscellaneous other repairing jobs in beas hmb555 ekg-5a shovel
Repairing of crowd intermediate shaft, crowd motor base plate, tie bar, bearing housing, driven-driving coupling and miscellaneous other repairing jobs in beas hmb555 ekg-5a shovel
Read moreTowards removal of cracked rhs intermediate shaft, pinion, gear, driving shaft, driving wheel, track pads, cleaning of gear housing, bushes removal and fitment of float rhs spares of hmb575 at lajkura ocp.
Towards removal of cracked rhs intermediate shaft, pinion, gear, driving shaft, driving wheel, track pads, cleaning of gear housing, bushes removal and fitment of float rhs spares of hmb575 at lajkura ocp
Read moreNctps i se m ii circle echs dn overhauling and reconditioning of worn out failed rotating assembly complete for fluidomat make fluid coupling model sc 12 released from the conveyor bcn 40b
Nctps i se m ii circle echs dn overhauling and reconditioning of worn out failed rotating assembly complete for fluidomat make fluid coupling model sc 12 released from the conveyor bcn 40b
Read moreSupply, installation, commissioning and succesfull trial of mill drive with 450kw ac vfd motor, planetary gear box and rope less coupling with all accessories along with complete automation before start of season 2025-26
Supply, installation, commissioning and succesfull trial of mill drive with 450kw ac vfd motor, planetary gear box and rope less coupling with all accessories along with complete automation before start of season 2025-26
Read moreRepairing of worn-out spline and teeth of driving wheel and spline of intermediate shaft of ekg shovel sl. no. hmb 578 at asbnocp, sijua area
Repairing of worn-out spline and teeth of driving wheel and spline of
 intermediate shaft of ekg shovel sl. no. hmb 578 at asbnocp, sijua area
Read moreRepairing of both side bull gear and pinion of propel shaft by welding and grinding , opening and fitment of propel gear box,material maching and grooming of both side propel shaft splines by welding and grinding , 19 n0s damaged tooth point of bull
Repairing of both side bull gear and pinion of propel shaft by welding and grinding , opening and fitment of propel gear box,material maching and grooming of both side propel shaft splines by welding and grinding , 19 nos damaged tooth point of bull
Read moreComplete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Complete repairing and overhauling of a)popular shaft of 58 screen and coupling of 79 belt conveyor b)bearing block with bearing in take-up drum (left and right side) of unit no. 66 and 79 belt conveyor in raw coal section at kathara washery
Read moreRepairing/ strengthening of bypass chute for unit 901 after dismantling of existing worn-out chute with its side skirts, shaft, rack and pinion of gate at moonidih coal washery.
Repairing/ strengthening of bypass chute for unit 901 after dismantling of existing worn-out chute with its side skirts, shaft, rack and pinion of gate at moonidih coal washery.
Read moreDismantling, repairing and fitment of take-up axle, take up wheel, idler wheel, intermediate shaft housing, propel shaft housing, bearing axle and repair of both side final drive of ekg 5a shovel sl.no. hmb-565 of gidi-c colliery.
Dismantling, repairing and fitment of take-up axle, take up wheel, idler wheel, intermediate shaft housing, propel shaft housing, bearing axle and repair of both side final drive of ekg 5a shovel sl.no. hmb-565 of gidi-c colliery.
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreof your Industry type