Tender Details
Particulars | Details |
---|---|
Title |
General Installation Of Mini Mast Light At 110 Kv Substation Road Junction Ward11 In Ottappalam Municipality Installation Of Mini Mast Light At 110 Kv Substation Road Junction Ward11in Ottappalam Muncipality General Electrical Work
|
Description |
Electrical Works
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id | 2024_LSGD_715508_1 |
Reference Number |
LSGD/CELSGD/TR/67353/2024 |
Tender Fee | 555 |
EMD | 4957 |
Tender Value | |
Place | OTTAPALAM |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1145779 |
Start Date | January 07, 2025 23:30 |
End Date |
14/01/2025 ( Expired 119 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreBeautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Beautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Read moreSupply, installation of high mast at primary pig loading area, new coil yard near hsm and other temporary storage in nsl
Supply, installation of high mast at primary pig loading area, new coil yard near hsm and other temporary 
 storage in nsl
Read moreWork of installing led high mast at bajna bus stand in ward no. 21 and triveni mela ground in ward no. 22 of ratlam city.
Work of installing led high mast at bajna bus stand in ward no. 21 and triveni mela ground in ward no. 22 of ratlam city.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreProvision of solar street light in mtrdc residential area and technical area roof top solar panels 40kw on grid power plant at alisda technical complex jalahalli area and ceiling suspended type cassetee and split air conditioning work at cair etcun
Provision of solar street light in mtrdc residential area and technical area roof top solar panels 40kw on grid power plant at alisda technical complex jalahalli area and ceiling suspended type cassetee and split air conditioning work at cair etcun
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreWork of supply, installation and commissioning of online dissolved gas analysis (dga) system at 220/103/33/11kv tivim substation.
Work of supply, installation and commissioning of online dissolved gas analysis (dga) system at 220/103/33/11kv tivim substation
Read moreof your Industry type